23
English
2
1
fig.32
fig.34
- insert the key into the cover switch (see fig.18)
and wait for the column to position itself into
the dispensing hole.
- load the other two columns which in the
meantime have become reachable (fig.31).
- if you want to fill up the column near the cup
conveyor, remove the holder retainer (fig.32
ref. 1) and lean the whole cup dispenser as
much as permitted (fig.32 ref. 2), complete
the cup column loading and then put back the
dispenser and the retainer.
-
replace the cover on the container.
6.8.4 Stirrer loading
- Remove the counterbalance bar from the
stirrer guides (fig.33)
- Introduce stirrers tightened with the band into
the column; once they are on the bottom, cut
the band and remove it (fig.34)
- put back the counterbalance bar (fig.35) after
completing the loading
- make sure stirrers have no seams, are not
bent and all lay horizontally.
fig.33
fig.35
Espresso Italia PTY LTD
www.espressoitalia.com.au
Freecall 1300 660 976
Summary of Contents for Group 200
Page 63: ...63 English Notes Espresso Italia PTY LTD www espressoitalia com au Freecall 1300 660 976 ...
Page 64: ...64 English Notes Espresso Italia PTY LTD www espressoitalia com au Freecall 1300 660 976 ...
Page 65: ...65 English Notes Espresso Italia PTY LTD www espressoitalia com au Freecall 1300 660 976 ...
Page 66: ...66 English Notes Espresso Italia PTY LTD www espressoitalia com au Freecall 1300 660 976 ...
Page 67: ...67 English Notes Espresso Italia PTY LTD www espressoitalia com au Freecall 1300 660 976 ...
Page 68: ...Cod 1813 956 ED01 Espresso Italia PTY LTD www espressoitalia com au Freecall 1300 660 976 ...