background image

MANUAL MACHINES                                                      02 TECHNICAL SPECIFICATIONS                                        

SAECO

Page       / 02

2.3.  Specifi cation for the measurement of the coffee products temperature.

The temperature is in

fl

 uenced by the 

fl

 ow from the dispenser and strati

fi

 cation of temperatures in 

the glass. In order to consider these phenomena and to introduce measures that allow compari-

sons in controlled conditions, below guidelines must be followed:

Conditions:

a) Water temperature in tank: 23°C (+/-2°C).

b) It must be used a plastic cup (see picture N°1).

c) It must be used a thermocouple thermometer (e.g. type K - see picture N°2).

d)  The  coffee  machine  is  tested  without  any  change  of  parameters  or  calibrations,  which  may                    

    affect the temperature of products, so the measurement of temperature must be done with  

    machine in default factory setting.

Procedure:

1. The temperature must be measured in the cup, immediately after dispensing. Cup has to be    

    placed on a non-metal surface using a thermocouple thermometer.

2. The temperature in the cup is measured by immersing the probe of the thermometer up to 

    touch the bottom.The probe then must be moved in a circular motion for 5/6 rotations. At the 

    of the rotations, stop in the center of the cup. 

3. The highest temperature measured during the rotations is the value we are searching for, and 

    that must be reported;

4. Test measurement: from end of dispensing to the end of rotations must be completed within 12 

    seconds.

    

Limits of acceptability

The acceptance limits are divided by features and products and are the following:

Espresso Coffee Italy Q.ty 25/40 gr.

Temperature of 1st product 69°C 

 85°C

Temperature of 2nd product 72°C 

 85°C

Coffee Q.ty 70/120 gr.

Temperature of 1st product 69°C 

 85°C

Temperature of 2nd product 72°C 

 85°C

Picture 1

Picture 2

02

Summary of Contents for Estrosa

Page 1: ...s document and all the information herein is provided without liability deriving from any errors or omissions Furthermore no part may be reproduced used or collected with the exception of that authori...

Page 2: ...erature 2 3 User instructions 3 1 Operation cleaning and maintenance 1 4 Operating logic 4 1 1 Water circuit 1 4 1 2 Exploded view of a water circuit in Estrosa and Carezza 2 4 1 3 Exploded view of a...

Page 3: ...ipe 3 7 2 1 Outer elements Carezza Estrosa 4 7 2 2 Pump Estrosa Carezza 5 7 2 3 Boiler support assembly Estrosa Carezza 5 7 2 4 Steam knob Estrosa Carezza 5 7 2 5 Steam pipe Estrosa Carezza 5 7 2 6 CP...

Page 4: ...SAECO MANUAL MACHINES CHAPTER 1 INTRODUCTION...

Page 5: ...diagnosis mode 1 Allen wrench 1 Hexagonal spanner 1 3 Material Description Notes Thermal grease Thermal resistance 200 C Descaler Saeco descaler Degreaser Personal choice Silicone grease Safe to use w...

Page 6: ...specific exploded view of the machine on website THERMAL CARAFE Only for OOW repairs YES to consult the specific exploded view of the Thermal Carafe on website MILK ISLAND Only for OOW repairs YES to...

Page 7: ...rts in manual machine Water tank ON OFF switch Hot water steam dispensing pipe Hot water steam dispensing knob Nozzle Drip tray grille Pressurised filter holder Selection knob Some machines have the s...

Page 8: ...Page 06 1 6 2 Internal machine parts in manual machine 04 Boiler assembly Pump assembly Overpressure valve Hot water Steam opening closing knob rod Thermal protector Overpressure relief valve Thermost...

Page 9: ...temperature thermometer Steam button Rinsing button Led Allarm Led Descaling On Off button Coffee button Led machine ON Led Temperature Led Rinsing Led Steam Knob Hot water steam Support for cups Dri...

Page 10: ...N SAECO Page 06 BOILER FLOW SELECTOR FAUCET Filter holder pressurised Boiler 1 7 2 Internal machine parts in Estrosa and Carezza Coffee Hot water steam Water tank Pump Boiler Hot water steam Cold wate...

Page 11: ...SAECO MANUAL MACHINES CHAPTER 2 TECHNICAL SPECIFICATIONS...

Page 12: ...heading phase of 8 2A during the brewing phase 8 5A Safety system 2 one shot thermostats 190 Coffee heat exchanger output Stainless steel 1900 W 230V for coffee hot water and steam dispensing Pump Ulk...

Page 13: ...ory setting Procedure 1 The temperature must be measured in the cup immediately after dispensing Cup has to be placed on a non metal surface using a thermocouple thermometer 2 The temperature in the c...

Page 14: ...SAECO MANUAL MACHINES CHAPTER 3 USER INSTRUCTIONS...

Page 15: ...scaling frequency Hardness Water hardness Without anti scale filter With anti scale filter 1 Soft up to 7 dH 240 litres 480 litres 2 Medium 7 14 dH 120 litres 240 litres 3 Hard 15 21 dH 60 litres 120...

Page 16: ...SAECO MANUAL MACHINES CHAPTER 4 OPERATING LOGIC...

Page 17: ...IPE DISPENSING COFFEE FILTER HOLDER PUMP OVERPRESSURE VALVE 4 1 1 Water circuit Various types for water circuit 01 COLD WATER HOT WATER STEAM HOT WATER Coffee Pump Boiler Hot water steam Water tank P...

Page 18: ...MANUAL MACHINES 04 OPERATING LOGIC SAECO Page 09 02 4 1 2 Exploded view of a water circuit in Estrosa and Carezza THERMOSTATS HOT WATER STEAM DISPENSING PIPE PUMP BOILER OVERPRESSURE VALVE...

Page 19: ...MANUAL MACHINES 04 OPERATING LOGIC SAECO Page 09 4 1 3 Exploded view of a water circuit 03 THERMOSTATS HOT WATER STEAM DISPENSING PIPE OVERPRESSURE VALVE PUMP BOILER...

Page 20: ...MANUAL MACHINES 04 OPERATING LOGIC SAECO Page 09 4 1 4 Hydraulic diagram in Estrosa and Carezza 04...

Page 21: ...MANUAL MACHINES 04 OPERATING LOGIC SAECO Page 09 4 1 5 Hydraulic diagram 05...

Page 22: ...MANUAL MACHINES 04 OPERATING LOGIC SAECO Page 09 4 2 1 Wiring diagram in Estrosa and Carezza 06...

Page 23: ...MANUAL MACHINES 04 OPERATING LOGIC SAECO Page 09 07 4 2 2 Wiring diagram 4 2 3 Electrical diagram...

Page 24: ...4 4 Spherical cappuccino maker and nozzle 08 HOT WATER STEAM PIPE FITTING STEAM STEAM HOT WATER STEAM PIPE FITTING AIR FLOW ADJUSTMENT NEEDLE MILK FROTHED MILK STEAM 4 3 Filter holder Pressurised and...

Page 25: ...oughout the duration of the descaling process the water is split according to the degree of hardness in a three phase by pass A B and C See small picture Bypass 4 6 Anti scale filter 09 4 5 Flow meter...

Page 26: ...SAECO MANUAL MACHINES CHAPTER 5 TROUBLESHOOTING...

Page 27: ...rn on Led coffee and move the Motor for 3 seconds Rinsing button turn on Led Rinsing and Pump Pressing again the Rinsing button the pump will turn off Steam button turn on the Led Steam STEAM OUT Push...

Page 28: ...ilk Carefully clean the nozzle or the cappuccino maker with water The coffee flows too quickly and does not form the cream Little coffee in the filter holder Grinding level too coarse There is a missi...

Page 29: ...SAECO MANUAL MACHINES CHAPTER 6 STANDARD INSPECTIONS...

Page 30: ...ule 10 Internal cleaning 11 Functional test with the machine open 12 Assembly 13 Final inspection test 14 Draining the circuit in winter 15 External cleaning 16 Insulation test HG 701 dielectric 17 Do...

Page 31: ...d Tolerance Coffee 2 3 Coffees for adjustment purposes Measuring beaker Noise Standard Amount of cream Blow into the cup until the cream separates The cream should come together again completely Cream...

Page 32: ...SAECO MANUAL MACHINES CHAPTER 7 DISASSEMBLY...

Page 33: ...ter drip tray the grille and the steam knob Loosen the screws as shown on the front and rear part of the machine Lift the cover and loosen the screws as shown Remove the side covers by lifting them up...

Page 34: ...the electrical connections and the two bright indicators Loosen the overpressure valve Remove the pump from the supports Remove the water connections and loosen the screws as shown Loosen the screws...

Page 35: ...rew channels holes not blocked and verify there is no limescale on any of the parts Shower Loosen the screws as shown Check the internal condition of the boiler limescale any breakages condition of th...

Page 36: ...grille the steam knob and pan narello steam knob pannarello water tank water drip tray and grille Upper cover LEFT and RIGHT side covers Loosen the screws as shown on the rear part of the machine and...

Page 37: ...emove the steam pipe Remove the pump from the sup ports as the picture Remove the water and electric connections Remove the water and electric connections Remove the water connections 7 2 2 Pump Esros...

Page 38: ...za Estrosa Carezza Loosen the screws as shown Loosen the screws as shown Loosen the screws as shown Loosen the screws the electric con nection and remove front panel as shown Loosen the screws the ele...

Page 39: ...MANUAL MACHINES 07 DISASSEMBLY SAECO Page 08 7 2 8 Filterholder locking ring Estrosa Carezza Loosen the screws Loosen the bolt Remove the cover pulling it down Remove the water connections 07...

Page 40: ...O Page 08 1 Boiler connection 2 Other connections Replacing the pipes 1 Use a suitable pair of pliers to remove the clamp as shown in the picture 2 Tighten the clamp as shown in the pictures 7 3 Un in...

Page 41: ...SAECO MANUAL MACHINES CHAPTER 8 NOTES...

Page 42: ...MANUAL MACHINES 08 NOTES SAECO Page 01 01...

Reviews: