English
21
fig. 19
fig. 20
fig. 21
fig. 22
C
D
C
C
C
E
E
1
F
D
E
B
A
To assemble the coffee grinder it is necessary to:
-
Completely screw the adjustment ring nut (ref.
E
, fig. 19), then
unscrew it by half a turn.
Important
This last operation is necessary both to avoid the jamming
and to prevent damaging the grinders.
-
Re-position the geared wheel (ref.
D
, fig. 20) and lock it by
tightening the screws (ref.
C
, fig. 20).
-
Re-position the coffee hopper (ref.
1
, fig. 21) by first hooking
the front part and then rotating it downwards.
Important
Attention should be paid to the positioning of the gasket (ref.
F
, fig. 21) which must fit properly in the geared wheel (ref.
D
,
fig. 21) and the ring nut (ref.
E
, fig. 21).
-
Secure the hopper (ref.
7
, fig. 21) by hand-tightening the screws
(ref.
B
, fig. 21).
-
Open the stop slide (ref.
A
, fig. 22).
-
Assemble the cup heating plate, by re-connecting it to the water
outlet pipe (ref.
B
, fig. 11), and the side panels (see “6.16
Disassembling/assembling the cover panels”)
Important
To resume normal machine operations it is necessary to verify
the correct adjustment of the grinding.