69
English
1. Install the heat recovery unit on a wall with a mass of
at least 200 kg/m
2
.
2. Mark the position for the fastening points on the wall.
- Wall Installation
1. Install the heat recovery unit on a ceiling with a mass
of at least 200 kg/m
2
.
2. Mark the position for the fastening points on the
ceiling.
- Ceiling Installation
3. Position the unit in suspension.
Take into consideration a minimum slope of 1% to-
wards the condensate drain.
4. Connect the condensate drain to the domestic sewage
system using a duct or pipe (siphoned).
3. Position the unit.
4. Connect the condensate drain to the domestic sewage
system using a duct or pipe (siphoned).
1%
1%
CONTROL
CONTROL