Page 3 of 5 - Info sheet 007, version 080514
SABA Dinxperlo BV
Industriestraat 3, NL-7091 DC Dinxperlo, Postbus 3, NL-7090 AA Dinxperlo, Visiting address: Weverstraat 6, NL-7091 CM Dinxperlo,
Tel +31 (0)315 658999, Fax +31 (0)315 658989, E-mail [email protected], Internet, www.saba.nl, Trade register Arnhem 09065419
Our recommendations and conditions for use are based on the present status of know-how and technology. Customers and users should assess our
products themselves for the desired application and demands. We are not responsible if our products are applied without considering our advice and/or
conditions for use. Furthermore the General Conditions of the Dutch Association of Rubber and Synthetic Manufacturers, dated 01.01.1992, are applicable
to our advice and conditions for use and the delivery of our products.
10. Place the whole installation on a wagon and/or cart, including the compressor and the power unit.
The wagon and/or cart, the compressor and the power unit are not supplied by SABA
.
11. Check speed and direction of revolution of the mixing equipment before opening the SABA Sealer
Field.
12. We advise that an inliner bag is placed in the pressure tank before it is filled with SABA Sealer Field
(photos 1 to 6).
1 2 3
4 5 6
13. After the SABA Sealer Field is mixed it can be poured into the inliner bag in the pressure tank.
14. Check that the tap above the sealer lance is closed before you bring the pressure tank up to working
pressure. Minimum 2.0 Bar depending on the required speed of outflow.
15. The outflow can be started and stopped by means of the tap on the top of the LD 40.
16. There is a chance of spluttering if the pressure tank is almost empty; at the first indication close tap
immediately and refill the pressure tank.
17. When refilling mix new tins of SABA Sealer Field first, and then de-pressurize and open the pressure
tank.