![Saab TankRadar G3 Service Manual Download Page 13](http://html1.mh-extra.com/html/saab/tankradar-g3/tankradar-g3_service-manual_3143594013.webp)
3 Equipment in the I/O Unit cabinet
13
G3 MaC Second edition, March 2000
3.5
I/O Terminals in I/O Unit - service
To replace a terminal
1
Identify the faulty terminal.
2
In the Saab TankRadar I/O Unit, turn off the power by
turning the automatic fuse switch on the I/O Terminal Main
Block to the off position.
3
Disconnect the connector (power and communication) from
the terminal.
4
Disconnect the cables from the cable terminal.
Note:
Make sure the cables are marked so you can re-connect
them.
5
Dismount the terminal from the rack.
Note
:
Depending on where the terminal is located in the cabinet,
it is dismounted either by turning it upwards or down-
wards.
6
Bring out the replacement terminal and compare settings
with the old one. Check the address switches and the jump-
ers.
7
Put the old terminal in an ESD protection bag for transport
to Saab Marine Electronics.
8
Mount the replacement terminal.
9
Connect the cables to the cable terminal.
Figure 3-4
The automatic fuse
switch on the I/O
Terminal Main Block
turns off the power in
the I/O Unit.
Summary of Contents for TankRadar G3
Page 1: ...SERVICE MANUAL MaC Monitoring and Control System...
Page 6: ...6 Service Manual G3 MaC Second edition March 2000...
Page 8: ...8 Service Manual G3 MaC Second edition March 2000...
Page 20: ...20 Service Manual G3 MaC Second edition March 2000...
Page 24: ...24 Service Manual G3 MaC Second edition March 2000...
Page 26: ...26 Service Manual G3 MaC Second edition March 2000...