background image

LoadSentry

Instruction Manual

MANU

Digital load measuring system

S2Tech srl

Via Imperia, 28 Milano

ITALY

Tel: +39 02 8910142 - Fax: + 39 02 89124848

e-mail:

[email protected]

www.s2tech.it

Version : UK 3r3 dated 05/05/17
Page: 4/6

699PLUS CONTROLLER CONNECTIONS

Screw Terminal

Meaning

1

GND (DC POWER SUPPLY)

2

+ 24 V (DC POWER SUPPLY)

3

EARTH connection

4

CONTACT I/O 2 (Display

Zeroing

)

5

CONTACT I/O 1 (Chain compensation)

6

I/O CONTACT's common reference

7

Relay 3

-

Normally Open contact

8

Relay 3

-

Normally Closed contact

9

Relay 3

Common contact

10

Relay 2

-

Normally Open contact

11

Relay 2

-

Normally Closed contact

12

Relay 2

Common contact

13

Relay 1

-

Normally Open contact

14

Relay 1

-

Normally Closed contact

15

Relay 1

Common contact

16

+ power supply to transducer

17

- power supply to transducer

18

+ signal form transducer

19

- signal from transducer

23

AGND (Analog output)

24

Analog Output

Ground to earth the 699 electronics

and

respect all the relevant safety and electrical

regulations

.

Once performed all the needed electrical connections feed power supply and wait 15
minutes, before calibrating.

Measurement changes are displayed in tens of the used

engineering units.

POWER SUPPLY = 24 Vdc

699PLUS CONTROLLER

QTY 1 699Plus weight controller
QTY 2 Fixing screws, type M4 x 12 UNI 7687
QTY 2 Nuts, type M4

PUSHBUTTONS AND THEIR ACTION for 699Plus programming

Use

or

to view available parameters.

Use

E

to view and modify existing numeric parameter or to confirm changes to parameter.

699Plus indicates that new parameter has been accepted by showing, briefly,

MEMO

and

Use

C

to:

abort changes to numeric parameter, maintaining the existing value
end calibration SAVE changed parameters - and start load measurement

To modify numeric parameters, use

to increase or

to decrease value of one unit.

+

E

increase value of 10 and then 100 units while

+

C

decreases of 10 and then 100

units.

Reviews: