9
S T A N D - A L O N E E N V I R O N M E N T & O P E R A T I O N
I N S T A L L I N G T H E P T - 6 0 0 2 U N I T T O T H E P T - B A S E
TOGGLE SWITCH OPERATION
The PT-6002 input will be connected to un-switched line voltage (through NEC appropriate GFCI breaker)
and can be operated manually by the on-board, 3-position switches or the included hand-held remote control.
Manual Operation
The channel is operated by a 3-position switch. To turn on, move the power switch to the upper, on position.
To turn off, move the power switch to the middle, off position.
Remote On/Off Operation
Move the power switch to the lower, remote position and use the hand held remote to toggle the low voltage
power circuit on and off.
See below for remote button functions and features.
1. Place the chassis on the installation base (from previous installation or purchase of optional
part PT-BASE).
2. Adjust the incoming 120V cable and all 12V outgoing cables to remove unnecessary loops and/or kinks.
3. Secure the PT-6002 unit to the PT-Base using the two supplied sheet metal screws.
4. Make sure that the 3-position switches are in the off (middle) position.
5. Place top cover onto unit and secure with the two supplied machine screws.
Circuit #1
ON
Circuit #1
OFF
Circuit #1
REMOTE
Circuit #2
ON
Circuit #2
OFF
Circuit #2
REMOTE
Summary of Contents for Power Tower PT-6002
Page 2: ...2...