Rx Monitoring Services EPA1500 Installation Manual Download Page 5

5

Specifications are subject to change without notice. 

©2013 Rx Monitoring Services, Inc.

4. Connect the Current Probes

Please note that connecting the current probes is 

a. 

a crucial part of the data gathering process. Please 

make sure you connect them to ensure that all 

supporting data is gathered.

Connect the current probes around L1, L2, L3, N 

b. 

& G (or all applicable phases) and make sure that 

there is only one phase in each current probe.    

Make sure that each current probe is encompass-

c. 

ing the correct phase and that the direction of the 

arrow on the probe is pointing toward the load.

Plug the connector end of the current probes 

d. 

into their corresponding ports on the front of the 

Power Monitor (to the right of the color-coded 

voltage ports). 

Caution: If running the CT wires out 

of the panel or system, wrap the “Safe-

ty Sleeves” provided in the safety kit 

around wires at pinch points.

Hard wired connection

EQUIPMENT

Current flow direction

Summary of Contents for EPA1500

Page 1: ...r improper use Installation must be performed from qualified personnel only Follow applicable safety work practices including using the proper personal protective equipment during install Installation...

Page 2: ...te the Power Monitor or probes around volatile gas or vapor WARNING DO NOT EXCEED SAFETY RATINGS Power Monitor CAT III 600V Pollution Degree 2 Rope CT s CAT III 1000V Pollution Degree 2 Clamp CT s CAT...

Page 3: ...obe 6 Power up the Power Monitor 7 Power up Load Circuit and System 8 Fill out Site Info and Detailed Site Log 9 Let the system run for approximately a week and then remove the Power Monitor WARNING H...

Page 4: ...L3 voltage leads al b ligator clip or strip to the main circuit breaker Connect the N lead to the Neutral bar if pres ent and the G lead to the main chassis or the Ground bar Connect the right angle b...

Page 5: ...and make sure that there is only one phase in each current probe Make sure that each current probe is encompass c ing the correct phase and that the direction of the arrow on the probe is pointing to...

Page 6: ...are subject to change without notice 2013 Rx Monitoring Services Inc Breakout cable connections Important Arrow on CT s must point toward load being monitored or the direction of current flow Current...

Page 7: ...o the Port 1 under AUX on the front b of the Power Monitor 5 Connect the Temperature Humidity Probe If Supplied Plug power cord into grounded receptacle a Plug the supplied IEC cord into the external...

Page 8: ...lay Sample Reading 8 Fill out Site Info and Detailed Site Log Please make sure you fully complete the RxMS Site a Information sheet with the detailed information of the site and equipment being monito...

Page 9: ...Disconnect all probes from the Power Monitor c Pack all equipment in provided shipping case d Attach the enclosed return label and ship equip e ment back to RxMS Please contact RxMS at 1 888 329 2321...

Page 10: ...ssumed by Rx Monitoring Services Inc for inaccuracy or changes that have taken place since production The Cx Monitor Installation Manual is for informational purposes only and is subject to change wit...

Reviews: