Step 13 

 

Step 14 

 
 

 

 
 
 

Carefully lift the assembly back into the normal 
position. If you are building a double or triple store, 
repeat steps 5 to 11 before arranging the completed 
units in their final location, ready to be connected as 
shown in the following steps. 

 

Manoeuvre 2 units into position next to each other, 
using an assistant if necessary in aligning the front 
centre posts... 

Step 15 

 

Step 16 

 
 
 

 

 

...at the top... 

 

...and at the bottom... 

 

 

Summary of Contents for Morcott wheelie bin storage unit

Page 1: ...tails on the final page of these instructions We highly recommend that any assembly is carried out on a flat level surface if possible and that you use another person to assist you if necessary Package contents Tools required Per Unit 2 x End panels 1 x Back panel 1 x Front panel 1 x Roof 1 x Metal bar 10 x 65mm screws 2 x 75mm screws 2 x spacer blocks 160mm Coach screws Multiple units only Double...

Page 2: ...ter end panel and a right panel with pre drilled clearance holes as shown above The right hand unit when constructing a double store will have a plain right outer end panel and battens attached to the left panel as indicated Step 3 Step 4 The triple will have 2 x units with 2 mirror plain outer ends with pre drilled inner panels as in Steps 1 4 and a centre unit with 2 end panels each with battens...

Page 3: ...o of the end panels will have supports for a shelf These should be paired together as shown above so the shelf can be supported as shown Step 7 Step 8 Stand the appropriate left hand end panel for the unit you are building upright on a flat level surface Arrange the 2 spacer blocks on the ground adjacent to the end panel as shown in the photo above Now place a back panel on the blocks at 90 to the...

Page 4: ...ed to the post Now secure the appropriate right hand side panel in place with 65mm screws in the same manner as you attached the left side panel Step 11 Step 12 Lay the assembly on its back and position the metal bar as shown across the bottom of the front posts Please note The metal bar will be screwed to the side panel during packing for security and will need to be removed prior to commencing c...

Page 5: ...fully lift the assembly back into the normal position If you are building a double or triple store repeat steps 5 to 11 before arranging the completed units in their final location ready to be connected as shown in the following steps Manoeuvre 2 units into position next to each other using an assistant if necessary in aligning the front centre posts Step 15 Step 16 at the top and at the bottom ...

Page 6: ... 17 Step 18 Now insert a 160mm coach screw into the pre drilled hole in the upper front post and drive it fully home pulling the 2 units together before adding another one at the bottom of the front post Step 19 Step 20 Add the rear coach screws in the same manner as the front ones For a triple store follow steps 12 to 17 and add the remaining unit using 4 coach screws as before ...

Page 7: ...re each end of the batten to the posts with an 75mm screw Step 23 Step 24 The roof s can now be propped in place as shown ready for you to hang the front door s using the hooks already fitted Your Morcott wheelie bin storage unit is now complete We hope that you found your product quick and easy to assemble but if not and you require any further assistance or have any questions you can contact us ...