Rupes HB 525 Operating And Maintenance Instructions Manual Download Page 5

 

 

ELECTRIC CONNECTIONS 
The arm is equipped with the following cables: 

-

 

One 3 x 2.5 mm

2

 cable, which supplies two 16 A sockets (item 1), marked by red tape. 

-

 

One 3 x 2.5 mm

2

 cable, which supplies one 16 A socket (item 2). 

-

 

One 4 x 1.5 mm

2

 cable, connected to the MAN-0-AUT switch. 

The cables are connected in the standard way. Connections with external equipment are shown in the 
diagrams enclosed to the above-mentioned elements. 

 
 
 

NOTE REGARDING THE HB525P – HB625P ARM 

-

 

One 3 x 2.5 mm

2

 cable, which supplies two 16 A sockets (item 1), marked by red tape. 

-

 

One 3 x 2.5 mm

2

 cable, which supplies single 16 A socket (item 2). 

-

 

One 2 x 1.5 mm

2

 cable, for connection with the turbine control cable. 

 
 
 

NOTE REGARDING THE HB525P – HB625P ARM 

-

 

One 3 x 2.5 mm

2

 cable, which supplies the whole arm. 

-

 

One 2 x 1.5 mm

2

 cable, for connection with the turbine control cable. 

 
 
 

NOTE REGARDING THE HB525P – HB625P ARM 

-

 

One 3 x 2.5 mm

2

 cable, which supplies the whole arm. 

-

 

One 2 x 1.5 mm

2

 cable, for connection with the turbine control cable. 

 
 
 

ATTENTION: 
All 3 x 2.5 mm

2

 cables, which supply the arm, should be connected to magnetothermal differential 

switch – 6Ka – 30 mA, 16 A. 
Only authorised and specialised personnel may perform the arm installation operations. 

 
 
 

PNEUMATIC CONNECTIONS AND DUST EXTRACTION 
The arm is equipped with the following tubes: 

-

 

1 caoutchouc tube, cross-section 10 x 19, which supplies two quick connections (item 9). 

 

Connect this tube to the compressed air system (max. pressure 8 bar). 

-

 

1 caoutchouc tube, cross-section 6 x 14, which supplies one quick connection (item 10). 

 

Connect this tube to the dry compressed air system (max. pressure 8 bar). 

-

 

1 corrugated tube for connection to the dust extraction line. 

 
Only authorised and specialised personnel may perform the arm installation operations. 

Summary of Contents for HB 525

Page 1: ...1 HB 525 HB625 PAT Multifunctional swing arm OPERATING AND MAINTENANCE INSTRUCTIONS ...

Page 2: ...et place in an atmosphere containing gas vapours or in a place where inflammable liquids are stored Protect yourself against electric shock Avoid contact with earthed objects or surfaces e g metal parts pipes radiators furnaces etc Never leave the device in place accessible for children or unauthorised persons In particular make sure that no unauthorised person has access to the unit Do not overlo...

Page 3: ...r compressed air with flow capacity 1500 l min max pressure 8 bar 1 quick connection for dry compressed air with pressure regulator and manometer one double dust extraction coupling 1 16 A electric socket 2 16 A electric socket 3 Lighting switch 4 Lamp with 300 W halogen bulb 5 Voltage indicator 6 Fuse 7 MAN 0 AUT switch 8 Safety cut out switch 9 Compressed air connection terminal 10 Dry compresse...

Page 4: ... 16 mm depth 90 mm This hole matches the upper right hole in the yoke Fig 3 Place the pin and slightly screw it in Mark the other holes using a spirit level to get them parrallel Fig 4 Move the yoke and start drilling place pins and fasten all elements after checking they are parallel with a spirit level Before installing the arm check that the pins firmly hold the arm base Fig 5 Fig 6 4 FASTENING...

Page 5: ...5 mm 2 cable for connection with the turbine control cable NOTE REGARDING THE HB525P HB625P ARM One 3 x 2 5 mm 2 cable which supplies the whole arm One 2 x 1 5 mm 2 cable for connection with the turbine control cable ATTENTION All 3 x 2 5 mm 2 cables which supply the arm should be connected to magnetothermal differential switch 6Ka 30 mA 16 A Only authorised and specialised personnel may perform t...

Page 6: ...ND PNEUMATIC CONNECTIONS DIAGRAM str 6 WIRING DIAGRAM str 8 PNEUMATIC CONNECTIONS DIAGRAM str 10 WIRING DIAGRAM WITH AUTOMATIC PNEUMATIC CONTROLLER str 11 WIRING DIAGRAM str 13 PNEUMATIC CONNECTIONS DIAGRAM str 14 ...

Page 7: ...ith the electrical system or compressed air supply system b mechanical damage caused by operation inconsistent with the enclosed operating instructions c any damage caused by operation inconsistent with the enclosed operating instructions d damage being the consequence of repairs carried out in any place other than warranty repair centre e operation actions specified in the operating instructions ...

Page 8: ...8 NOTES ...

Page 9: ...9 Poland 05 083 Zaborów Borzęcin DuŜy ul Warszawska 749 tel 022 752 06 00 fax 022 752 05 92 e mail nts nts com pl http www nts com pl ...

Reviews: