Ruijie EG3250 Hardware  Installation And Reference Manual Download Page 15

RG-EasyGate Series Hardware Installation Guide V1.60 

 

 

 

If the device is installed in a cabinet, check whether the angle bar for device installation is steady. If the device is 

installed on the workbench, check whether sufficient room is reversed around the device to ensure heat elimination 

and whether the workbench is steady.     

 

Check whether the power supply meets the requirements.     

 

Check whether the earth wire of device is properly connected.     

 

Check whether the device is connected correctly to other devices like the configuration terminal.     

Starting and Configuring the Breakout Gateway   

Starting a Breakout Gateway   

Powering on the Breakout Gateway   

Checks before Power-on   

Before power-on, perform the following checks on the breakout gateway:     

 

Whether the power cable and the ground wire are properly connected;     

 

Whether the power voltage is consistent with the requirement of the breakout gateway. 

 

Whether the configuration cable is properly connected, and whether the microcomputer or terminal for gateway 

configuration is started or configured.     

 

Before powering on the breakout gateway, be aware of the location of the power switch of the breakout 

gateway to timely cut off power supply in case of any accident.     

Powering on the Breakout Gateway   

 

Turn on the power supply switch of the breakout gateway   

 

Turn on the power switch of the breakout gateway and set the power switch to "ON" position.     

Checks after Power-on   

After the breakout gateway is powered on, check the following items: 

 

Whether the ventilation system works normally   

Checking procedure: After power-on, you can hear the fan working; put your hand nearby the vent hole of breakout 

gateway to feel the airflow.     

 

Whether the LED indicators on the front panel of the breakout gateway works normally.     

Checking procedure: Refer to the section of indicators description about each product in the first chapter 

“Product 

Overview

”. 

 

Whether the configuration terminal displays normally   

Checking procedure: After the breakout gateway is powered on, the terminal will display the software self-extracting 

information of the breakout gateway.     

Summary of Contents for EG3250

Page 1: ...RG EasyGate Series Hardware Installation Guide V1 60 RG EasyGate Series Products Hardware Installation and Reference Guide V1 60...

Page 2: ...this document in any form or by any means without the prior written consent of Ruijie Networks is prohibited Exemption Statement This document is provided as is The contents of this document are subje...

Page 3: ...stance Ruijie Networks Website https www ruijienetworks com Technical Support Website https ruijienetworks com support Case Portal http caseportal ruijienetworks com Community http community ruijienet...

Page 4: ...configuration commands can easily use this product without training Ruijie EG Series Breakout Gateways Ruijie EG3250 Breakout Gateway Appearance of Ruijie EG3250 Breakout Gateway Figure 1 1 Front Pan...

Page 5: ...232 Dimension W x H x D 440mm x 43 6mm x 200mm excluding the foot pad Voltage 100VAC to 240VAC 50 60 Hz 0 65A Power Consumption Less than 25W Working Environment Temperature 0 C to 45 C 32 F to 113 F...

Page 6: ...t Gateway Full Support to Extensive Protocols Ruijie EG series breakout gateway is applicable to different network environment as it provides full support to extensive protocols Providing RJ45 port an...

Page 7: ...nd user based real time flow analyzer provides detailed information on source destination IP address service port application protocol session number and flow size Supporting user source IP address de...

Page 8: ...e and other deployment modes meeting the need for deployment in various contexts The transparent bridging does not change the configurations of other devices allowing complete URL filtering flow contr...

Page 9: ...he clock If the clock is not set the time may not be correct if the clock has been set precisely and the time is still incorrect the built in button cell of device may have ran out which is typically...

Page 10: ...4 m ahead of the equipment frame when there is no protection plate on the front and rear side of the equipment frame Short term working condition refers to the continuous operation no exceeding 48 ho...

Page 11: ...bag When observing or transferring the circuit board of breakout gateway touch the outer edge of circuit board and avoid direct contact with the components on the circuit board Anti Interference Requ...

Page 12: ...essories Make sure the cabinet and workbench is properly grounded Installation Tools and Devices To enable smooth installation prepare the following items Installation tools Connecting cables Related...

Page 13: ...reserve a heat elimination room of 10 cm around the device Do not place heavy things on the device Installing Power Cables The requirements of Ruijie EG series breakout gateway products on AC power s...

Page 14: ...attributes of a console are shown in Table 3 1 In case of WEB based configuration the console port will be of no use Table 3 1 Attributes of the Console Connection Parameter Description Connector RJ 4...

Page 15: ...connected and whether the microcomputer or terminal for gateway configuration is started or configured Before powering on the breakout gateway be aware of the location of the power switch of the break...

Page 16: ...LED indicators If abnormity occurs perform the following checks Whether the power switch is turned on Whether the power supply of the breakout gateway is turned on Whether the power cable is properly...

Reviews: