background image

 

 

 

Figure 4-3 Setting Communication Parameters for Serial Port.   

 

After building the configuration environment, you may power on the wireless controller 

4.2  Powering on Wireless Controller 

4.2.1  Verification Before Power-on 

Before powering on the wireless controller, please check the following items: 

Summary of Contents for RG-WS6008 Series

Page 1: ...RG WS6008 Series Wireless Controller Hardware Installation and Reference Guide V1 0...

Page 2: ...rm or by any means without the prior written consent of Ruijie Networks is prohibited Exemption statement This document is provided as is The contents of this document are subject to change without an...

Page 3: ...ttp www ruijienetworks com service aspx Technical Support Hotline 86 4008 111 000 Related Documents Documents Description Configuration Guide Describes network protocols and related mechanisms that su...

Page 4: ...B ports Interface Standard Ethernet port 10Base T 100Base TX 1000Base TX and 1000BASE SX LX ZX Configuration port Console port RS 232 Dimensions W x D x H 440 mm x 200 mm x 43 6 mm excluding foot pad...

Page 5: ...system sends out an alarm 1 8 Gigabit copper ports link ACT Solid green The copper port is connected at 10 100 1000 Mbps Blinking green The copper port is receiving or transmitting data 1 8 Gigabit co...

Page 6: ...ttery by yourself Instead contact Ruijie Service Center for the replacement of battery This device is an A class product It may cause radio interference in living environment which may require you to...

Page 7: ...st occurs more easily when the relative humidity is low which may shorten the service life of the device and cause communication failures Table 2 2 shows the maximum concentration and diameter of dust...

Page 8: ...tions and high frequency high current devices Use EMI shielding when necessary 2 1 5 Installation Site Requirements To install the wireless controller whether in the cabinet or on the workbench pay at...

Page 9: ...ss controller is ready for installation Mount it to either of these two places A cabinet A workbench 3 2 1 Mounting RG WS6008 in Cabinet RG WS6008 is designed according to the specification of 19 inch...

Page 10: ...ee wire power socket or multi functional microcomputer socket with neutral point connector The neutral point needs to be grounded safely Check whether the power supply in your building is grounded pro...

Page 11: ...sole port of the wireless controller and the other end to the DB 9 male serial adapter of the microcomputer 3 6 Verification When you have installed the wireless controller before powering on it pay a...

Page 12: ...mputer you will need to run a terminal emulation program like Windows operating system s Hyperterm Take Hyperterm for example 1 Run Hyperterm and create a connection 2 Select the serial port to be con...

Page 13: ...r Serial Port After building the configuration environment you may power on the wireless controller 4 2 Powering on Wireless Controller 4 2 1 Verification Before Power on Before powering on the wirele...

Page 14: ...the front panel of the wireless controller are in the proper state See LED Indicators in Chapter 1 If the configuration terminal displays information as expected When the wireless controller is power...

Page 15: ...Starting snooping elf OK Starting postgresql server mnt sata0 pgsql bin postgres not found OK Starting rg mtdoops cli OK Starting sntp elf OK Press RETURN to get started May 15 11 08 01 CAPWAP 4 NO_IP...

Page 16: ...shooting If the system is operational relevant information is displayed on the terminal as described in chapter 4 Otherwise nothing or gibberish is displayed If nothing is displayed please check the f...

Reviews: