![Ruijie Networks RG-WALL1600-S3100 Hardware Installation And Reference Manual Download Page 18](http://html1.mh-extra.com/html/ruijie-networks/rg-wall1600-s3100/rg-wall1600-s3100_hardware-installation-and-reference-manual_1499722018.webp)
4)
Click
Finish
, and the following interface will be displayed.
Figure 4-8
4.2 Power-on Startup
Checking Before Power-on
The device is properly grounded.
The power cable is correctly connected.
The power supply voltage complies with the requirement of the device.
The console cable is correctly connected; the terminal (can be a PC) used for configuration is already started; the
parameters are already configured.
Checking After Power-on (Recommended)