TriggerTrac Installation Checklist
Please complete this checklist after any installation:
Check 1: Pre-power up checks.
Mounted onto a wall of a construction capable of supporting its weight and gameplay.
☐
All fixings are tight and secure.
☐
No signs of damage, component failure and/or missing parts.
☐
No trapped and/or pinched cables.
☐
No loose cables that could become a tripping hazard.
☐
All long cables are supported at least every 50 cm.
☐
Adequate strain relief provided for connection points.
☐
Kept out of direct sunlight during the day.
☐
All electric components away from contact with water.
☐
Protective plastic sheet from each panel removed.
☐
Check 2: Power up.
All panels light up.
☐
Text appears on the hub display and is as expected.
E.g. timers
☐
Sound volume is at a suitable level
*
.
☐
Check 3: Select the Start button.
Button active and operational.
☐
Sounds can be heard when the button is hit.
☐
A whistle sounds and timer start.
☐
Program plays as described in the Programs Guide.
☐
Check 4: Stop Pressure Panel.
Panel active and operational.
☐
Timer stop when panel pressed.
☐
Sound heard when panel is pressed.
☐