Ruby 025 FDA Installation, Operation And Maintenance Manual Download Page 22

22

6.3 Exploded View and Spare Parts List

6.3.1 Exploded view

 

                                                 

 

                                             025 FDA Stainless steel spare part list pump 

 

 

 

 

 

 

 

 

 

 

   

 

      

  25              

 

   

25

   

 

                                                                    

     

  

    23 

 

 

 

     

 

 24 

3                  23 

 

   22A 

 

 

 

24 

 

        

                                                                              22A 

                                                          

   

                                                        38 37 35                            

                                                                 15                                15   

             21 23    22     

   17                                 17   

 

 

                                      4        5              18                                 18 

 

                                                                16                                 16           12                                                                                   

 

13   

                                                       6   8 10 9 11  

 5        4         

 

                                      22  23          21 

 

           14     7      6                          

 

 

 

 

19 

 

                           11 9 10 8  

 

 

29                                              19 

 

       1     20 

                                                                   17 

 

                                                                   15                                17 

                                                                   18                                15 

                                                                   16                                18 

                                                                                                       16 

 

 22A 

                                                       38   37   35                                  24         

 

                                                                  22A              2 

23 

                                                                     24                                  25 

                                                                     23        

   41 

                                                                     25                                  40 

                                                                                                           39                                                        

 

 

    

 

 

POS 

DESCRIPTION 

QTY 

 

POS 

DECRIPTION 

QTY 

CENTRAL BLOCK  

18 

BALL SEATS 

SUCTION MANIFOLD  

19 

RETAINING RING AIR VALVE 

DISCHARGE MANIFOLD  

20 

AIR CONTROL VALVE 

PUMP HOUSING 

21 

HOUSING PUMP SCREW 

16 

DIAPHRAGMS 

22 

BALT 

16 

PISTON INNER 

22A 

NUT 

SHAFT 

23 

WASHER 

24 

RETAINING RING SHAFT  

24 

WASHER (GROOVE) 

O-RING BEARING 

25 

MANIFOLD SCREW 

10 

SHAFT BEARING 

29 

DRIVE AIR INLET 

11 

O-RING BEARING 

35 

ORING PTFE  

12 

SILENCER 

37 

CLAMP RING 

13 

AIR EXHAUST SCREW 

38 

CAP 

14 

AIR EXHAUST COVER 

39 

ANTI-VIBRATION FEET 

15 

BALL SEAT ORING 

 

40 

WASHER 

16 

BALL SEAT ORING 

 

41 

BOLT 

17 

VALVE BALLS 

 

  

  

  

Summary of Contents for 025 FDA

Page 1: ...2G x h IIB T4 Gb II 2D x h IIIB 135 C Db Baseefa15ATEX13DR RN3 Installation Operation and Maintenance AirOperatedDiaphragmPumps Industrial Park of Kifisia HELLAS www alphadynamic eu RUBY025FDA...

Page 2: ...12 3 4 Pump in submerged operation 12 3 5 Connecting to the product circuit 12 3 6 Noise emissions 2003 10 EC 13 3 7 Temperature range of the diaphragm material 13 3 8 Temperature range of the Housing...

Page 3: ...3...

Page 4: ...4...

Page 5: ...ntenance or repair of the pump must have read and understood these instructions especially the chapter on Health and Safety This applies in particular for those who are only occasionally involved in w...

Page 6: ...pment for use in potentially explosive atmospheres Basic method and requirements EN ISO 80079 37 Non electrical equipment for explosive atmospheres No electrical type of protection by constructional s...

Page 7: ...l consumable material such as diaphragms ball seats balls and others The warranty does not cover parts damaged as a consequence of incorrect installation carelessness neglect incorrect maintenance or...

Page 8: ...d maintenance manual have been analysed whilst the analysis of the risks associated with the interface with other system components must be carried out by the installer The user is responsible for cla...

Page 9: ...not be used with fluids that arc not compatible with its construction materials or in a place containing incompatible fluids WARNING installing the pumps without on off valves on the intake and deliv...

Page 10: ...eter and length Position the pump as close as possible to the point of collection within 2 5 m and in any case never more than 5 m The diameter of the intake pipe must never be smaller than the connec...

Page 11: ...ef valves pressure gauges flow control valves and shut off valves 6 Thoroughly examine the alignment of the pump with the pipelines in order to avoid strain and premature wear 7 Check all pipelines fo...

Page 12: ...n operation RubyAir Operated Diaphragm Pumps are dry self priming Depending on the pump design a suction head of max 9 m Wc can be reached when the suction line is filled 3 4 Pump in submerged operati...

Page 13: ...ucted nor limited to avoid either cavitation or pneumatic motor strain Connection off the product circuit finishes here 3 6 Noise emissions 2003 10 EC In a room with several pumps you may experience a...

Page 14: ...housings by untying the screws gradually and cyclically Step 4 Detach the diaphragm from the central block by hand and untie it with a left rotation Step 5 Untie the opposite housing and pull the dia...

Page 15: ...p 3 We put the sealing o ring of the lateral cap Step 4 We install the pilot shaft Step 5 Then we install the cap up to the safety point Step 6 Then we install the safety we reverse the central block...

Page 16: ...4 Assembling Diaphragm installation Step 5 We put at the pump air entrance air of 0 5 bar pressure and we see in which side of the block the entrance holes at the back of the di aphragm are releasing...

Page 17: ...intenance engineers In event of abnormal behaviour and in order to fix faults please refer to the following troubleshooting instructions WARNING For more serious problems we strongly recocomend that y...

Page 18: ...18 6 0 Technical data 6 1 Dimensional drawings...

Page 19: ...te 165 L min Air inlet 1 2 Suction Discharge port DN 40 TRICLAMP Suction lift dry 4 m Max Solid size diameter 3 5 mm The curves and performance values refer to pumps with submerged suction and a free...

Page 20: ...r inlet 1 2 Suction Discharge port DN 40 TRICLAMP Suction lift dry 4 m Max Solid size diameter 3 5 mm The curves and performance values refer to pumps with submerged suction and a free delivery outlet...

Page 21: ...inlet 1 2 Suction Discharge port DN 40 TRICLAMP Suction lift dry 4 m Max Solid size diameter 3 5 mm The curves and performance values refer to pumps with submerged suction and a free delivery outlet...

Page 22: ...LL SEATS 4 2 SUCTION MANIFOLD 1 19 RETAINING RING AIR VALVE 2 3 DISCHARGE MANIFOLD 1 20 AIR CONTROL VALVE 1 4 PUMP HOUSING 2 21 HOUSING PUMP SCREW 16 5 DIAPHRAGMS 2 22 BALT 16 6 PISTON INNER 2 22A NUT...

Page 23: ...R025 0140 SILANCER 025 1 25 12A R025 0140A SUPPORT SILENCER 025 1 25 13 R025 0185 AIR EXHAUST SCREW 2 25 14 R025 0141 AIR EXHAUST COVER 1 25 15 R025 0171 VALVE SEAT ORING DOWN 025 PTFE 4 25 16 R025 01...

Page 24: ...ALPHADYNAMIC PUMPS AirOperatedDiaphragmPumps Industrial Park of Kifisia HELLAS www alphadynamic eu VER 01 2021 VER 02 2021...

Reviews: