2.
Installation of Repeater
After planning the network, next is to determine the proper places or location the repeater. The repeater should be
mounted as high as possible (2 meters or higher).
2.1.
Package
–
Contents/Damage Inspection
Before Package Is Opened:
Examine the shipping package for evidence of physical damage or mishandling prior to opening. If there is a proof of
mishandling prior to opening, you must report it to the relevant support center of the regional representative or
operator.
Contents of Package:
Make sure all relevant components are available in the package before proceeding to the next step.
Every shipped repeater package/box contains the following items:
1 x Power supply
1 x Repeater
1 x Table stand
1 x Safetysheet
2.2.
Damage Inspection
The following are the recommended procedure for you to use for inspection:
1. Examine all relevant components for damage.
2. Make a “defective on arrival –
DOA” report or RMA to the operator. Do not move the shipping carton until
the operator has examined it. If possible, send pictures of the damage. The operator/regional representative
will initiate the necessary procedure to process this RMA. They will guide the network administrator on how
to return the damaged package if necessary.
3. If no damage is found, then unwrap all the components and dispose of empty package/carton(s) in
accordance with country specific environmental regulations.