
32
Test Button
The
Test
button is used to test the frame mapping configuration you create. Once you have tested your frame map
configuration, press the
Apply
button to implement the modifications you make. The message below appears if the frame map
is deemed valid.
Done Button
The
Done
button is used to close the Frame Mapping window.
Select Frame Window
The
Select Frame
window, shown in Figure 46, is used to select a Frame (IP Address and MAC Address) to include in the
Frame Mapping table for your Tribus Intercom System.
IP Address 1 Column
The
IP Address 1
column displays the IP Address of the active master controller in the ADAM frame.
FIGURE 45.
Frame Mapping Table Valid message
FIGURE 46.
Select Frame Window
Summary of Contents for TBX - TriBus ADAM
Page 1: ...ADAM TBX TriBus Triple Bus Expander for ADAM 93507838000 Rev A 12 2008...
Page 4: ......
Page 6: ......
Page 14: ...10...
Page 15: ...11 Figure 2 Eight Frame Tribus System Non Redundant...
Page 16: ...12...
Page 20: ...16...
Page 29: ...25 FIGURE 38 Base 8 Port Numbering scheme with both AIO 16 and an AIO 8 card installed...
Page 48: ......