Rev. 9/2017
www.driair.com | www.rti-pbe.com
(800) 521-9200
@RTiPBE
@rti_pbe
RTi Compressed Air Audit Sheet
Size (HP):
Tank (Gal):
Type:
Drained: Y N (circle one)
When:
How often:
Recommendations:
Air Tests:
Air Compressor:
Location:
Compressed Air Dew Point:
Compressed Air Humidity @ 70°
F:
Contaminants:
Type:
Air Flow Test (Pass/Fail):
Location:
Compressed Air Dew Point:
Compressed Air Humidity @ 70°
F:
Contaminants:
Type:
Air Flow Test (Pass/Fail):
Piping, Hoses & Couplers:
Material Type: Hose Size:
1/4" 15/16" 3/8"
Size:
No. of Drains/Drops:
Filtered: Y N (circle one)
System: Dead End or Loop (circle one)
ACFM Requirements:
ACFM:
Filters:
Refrigerated Dryer:
Filter Elements:
Desiccant Dryers:
Gun Filters:
Drained: Y N (circle one)
How Often:
Date of Last Change:
How Often:
Date of Last Change:
How Often:
Date of Last Change:
How Often:
Y N
Y N
Y N
Y N
Brand you’re using:
Company Name:
Address:
City, State, Zip Code:
Phone:
Date:
Email:
Distributor:
Contact Person:
Name of Representative:
Date:
**In order to make our air audit procedures more efficient and provide more in depth results for the shops, you can download an app on your phones
called “Calculator of Air”. You need to input 2 lines. The first is temperature which will always be 70
°
F (paint company recommended temperature).
The second is the dew point from your QAT tester. Push enter and you will see the wet bulb number. This is a more accurate reading for the compressed
air humidity percentage (CAH).