- page 7 of 13
–
Inst ruct ion and operat ing manual GHH
CS750 direct driven
(for-030/031013)
3
Mounting installation
3.1
Mounting instructions RTI installation powerband driven
A
While placing the installation on a pallet, make sure the installation is approximately
30 cm off the ground (raising the installation w ith timber if necessary).
B
Drive the installation up to the desired location next to the truck. Make sure the
angle of the drive shaft is as small as possible.
Please find the maximum mounting
angle in the mounting instructions provided by the truck manufacturer.
Image 3.1.1
C
Place the installation at the same level as the chassis and parallel to the truck.
Measure the PTO-
shaft. Make sure the installation doesn’t exceed the w idth of the
truck.
D
Measure the brackets and try to use all
the holes in the chassis. Brackets
should
be
painted
or
otherw ise
protected against corrosion. (With a box
or tank combination at least 4 brackets
should be used)
E
Mount the brackets onto the chassis
and onto the installation.
F
If the installation is equipped w ith an
external oil cooler:
Connect the w ires of the sw itch box
(image 3.1.2).
G
Cover the brackets w ith an aluminium
panel.
image 3.1.2
NOTE
With a vacuum installation t he vacuum valve must be set to -0.5 bar. Please
note: the vacuum valve should be set w hen testing the installation before initial
operation. The vacuum valve has not been set w hen the installation is delivered
as a building kit (w ithout mounting by RTI).
Cont rol light
Connect t o bat t ery
- = black
+ = red
Connect t o fan
- = black
+ = red