background image

 

RST Instruments 

2  TILTMETER

 

MONUMENT

 

INSTALLATION 

In order for the Tiltmeter installation to be successful, the Tiltmeter Monument must be rigidly 
connected to the structure of interest, free of long-term adverse factors including corrosion, form 
distortion, and impact damage. 

2.1  F

RESH 

C

ONCRETE 

H

ORIZONTAL

 

In a typical installation on new concrete, the following procedure is suggested: 

After the concrete has been placed and leveled in the location of interest, work the Tiltmeter 
Monument into the concrete until the top surface of the plate is level with the concrete surface, with 
the diagonal stud pairs aligned with the desired measurement axes, ideally with the orientation of the 
studs consistent across the entire site. 

If desired, increased strength of placement may be achieved by fitting countersunk brass screws 
through the mounting holes and tightening nuts on the back side, leaving 50 mm of threads exposed 
below the Tiltmeter Monument. 

Ensure that no concrete is permitted to remain on the top of the Tiltmeter Monument, especially on 
the studs.  If necessary, carefully clean the studs with a damp cloth.  Ensure that the Tiltmeter 
Monument is protected from damage during curing, form stripping, and subsequent operations. 

2.2  F

RESH 

C

ONCRETE 

V

ERTICAL

 

In order to avoid damage during form stripping, it is suggested that a separate form segment be built 
in such a manner that the Tilt Monument is stripped separately.  The separate form segment can be 
drilled to suit the studs and greased to facilitate the stripping of the form and subsequent cleanup of 
the Tiltmeter Monument.  The separate form segment may ideally be recessed slightly below the 
main vertical surface to give enhanced safety from damage. 

The Tiltmeter Monument should be mounted with its face vertical and the axis from stud 1 to stud 3 
vertical. 

2.3  E

XISTING 

C

ONCRETE

 

The Tiltmeter Monument may be attached to existing concrete using mechanical fasteners, using 
grout, or a combination of methods.  Mechanical fasteners require precise concrete drilling and/or a 
central adapter plate.  The effectiveness of grouts, either cement-type or chemical, is highly 
dependent on the concrete condition, surface preparation, site conditions and other variables. 

 

 

Figure 2: Tilt Monument Plate

 

Summary of Contents for ICTS0005

Page 1: ...td All Rights Reserved RST Instruments Ltd 11545 Kingston St Maple Ridge B C Canada V2X 0Z5 Tel 604 540 1100 Fax 604 540 1005 Email info rstinstruments com Website www rstinstruments com MEMS Portable...

Page 2: ...ccuracy and completeness of the information contained in this document RST Instruments reserves the right to change the information at any time and assumes no liability for its accuracy Product MEMS P...

Page 3: ...ER MONUMENT INSTALLATION 2 2 1 FRESH CONCRETE HORIZONTAL 2 2 2 FRESH CONCRETE VERTICAL 2 2 3 EXISTING CONCRETE 2 3 READING METHOD 3 4 DATA REDUCTION 4 5 CARE AND MAINTENANCE 4 APPENDIX 5 LIST OF FIGUR...

Page 4: ...he Tilt Monuments are fastened to the structure of interest by methods which depend on the material of the structure Both stainless steel and brass materials are resistant to corrosion in many constru...

Page 5: ...Monument especially on the studs If necessary carefully clean the studs with a damp cloth Ensure that the Tiltmeter Monument is protected from damage during curing form stripping and subsequent opera...

Page 6: ...ltmeter Monument so that two diagonally opposite studs ie stud 1 stud 3 are in contact with the long alignment bar and one of the alternate studs ie stud 2 is in contact with the short alignment bar S...

Page 7: ...with stud 3 visible sin 4 the raw new data with stud 4 visible 5 CARE AND MAINTENANCE The Tiltmeter should be treated gently like any precision instrument In particular care should be taken to avoid a...

Page 8: ...5 RST Instruments APPENDIX...

Reviews: