d)
a)
3.3 - Rigging the
Mast
3.4 - Stepping the
Mast
REMEMBER
If you are rigging the
Jib
and
Gennaker
Packs, you need to read Sections 3.9 and
3.10 before stepping the
mast
Now the
mast
is ready to be put up in the boat, or ‘stepped’.
BEFORE PICKING UP THE
MAST
, CHECK THAT YOU ARE NOT IN
THE VICINITY OF OVERHEAD POWER CABLES
The
mast
-gate pin is already fitted to your Feva. The
pin has a locking nut on the bottom to prevent it from
falling out.
To close the mechanism:
1) Push the Pin through the gate from above.
2) Screw down the knurled nut until it is tight.
The
Mast Gate Pin
• Remove the
mast gate pin
from the
hole and open the
mast gate
.