Marking the layout of the pool
Before assembling, proceed to clean the slab to eliminate all kinds of impurities (sand, twigs, leaves, etc).
The slab should be smooth without irregularities and properly leveled to allow the correct assembly of the pool.
IMPORTANT:
The assembly of the pool should be performed after complete drying of the concrete slab (2/3 weeks).
Dimensions shown are interior dimensions.
On the concrete slab perform marking the route of the
pool. A first marking finds the center point of the concrete
slab
(0).
Perform marking of points
1
and
2
separated 3.5725
m from the center of the pool
(0).
Repeat to get points
1 and 2 with a distance of 1.45 m from the center of the
pool
(0)
. Make sure 1/2 is 3/4 perpendicular.
From points
3
and
4
draw two parallel lines the
1 / 2
over the entire length of the concrete slab.
From points 1 and 2, draw two lines parallel to the lines
3/4.
Confirm the corresponding diagonals with the
measurement of 7,72 m and with this way you will obtain
the form for the installation of the pool.
After the correct marking of the layout of the pool, it is time
to begin the assembly of the structure. The assembly of the
structure is initiated by the placement of the corner pillars.
Choose one of the corners of the pool to begin placement
of the structure.