Beam n.º 5

Placement of beam n.º 5

BEAM N.º 5 AND PANEL SKIMFILTRE

and panel skimfiltre

Beam n.º 5

Panel skimfiltre

The two beams are placed on each side of skimfiltre, occupying the space of the 5th to the 7th row 

and are identified with n.º 5. Between the two beams it is placed a steel panel for fixing the skimfiltre.

Placement of Panel skimfiltre

Placement of beam n.º 5

IMPORTANT:

After placing the Skimfiltre steel panel, approximate beams n.º 5, 

as shown in the photograph

Summary of Contents for Naturalis

Page 1: ...NATURALIS 03 2 90 x 7 14 m RECTANGULAR 1 40 An RP INDUSTRIES product ASSEMBLY INSTRUCTIONS GUIDE...

Page 2: ...onstant Designate just one responsible for the security Get stronger the supervision when there is a lot of people inside the pool Get wet nape arms and legs before getting inside the water Learn life...

Page 3: ...lab The concrete slab must be made two weeks before the start of the assembly Check if The electrical connections of the equipment are installed by a qualified technician Make sure you have enough wat...

Page 4: ...Lenght m Lenght m Height m Water Volume m3 Liner Filtration Widht m Widht m Weight Kg Outside Inside Depth water m Blue pale Cartridge 16 m3 h Excavation Concrete slab Blue Thread Concrete drill n 10...

Page 5: ...ut of the pool 5 Fastening the pillars and the base structure 6 Setting up the aluminium profil 7 Setting up Beam n 1 8 Setting up Beam n 2 9 Setting up Beam n 4 10 Setting up Beam n 3 11 Setting up B...

Page 6: ...of the pool with an already existing construction house wall terrace etc to fit perfectly in your environment Excavation IMPORTANT The structure of your pool must be built on a consolidated field stab...

Page 7: ...ich can damage the concrete work and cause the appearance of spots on the liner Concrete slab IMPERATIVE The pool has to be built on a concrete leveled slab only 1 cm is tolerated between the highest...

Page 8: ...rete slab 0 Perform marking of points 1 and 2 separated 3 5725 m from the center of the pool 0 Repeat to get points 1 and 2 with a distance of 1 45 m from the center of the pool 0 Make sure 1 2 is 3 4...

Page 9: ...ixing between the corner pillar and the right pillar that make up the corners of the pool the joints between the corners are used Union between corners The joints allow to unify the pillars that make...

Page 10: ...verify the dimensions and the leveling of the structure as indicated After performing the positioning of the pillars and the base structure as indicated in the plant confirm the dimensions of the dia...

Page 11: ...ixing the base structure Fixing of triangular reinforcements ATTENTION Should screw all pillars making sure they are leveled and upright Using the same method of fixing pillars make the fixing of pane...

Page 12: ...ovided in the kit Proceed to the set of profiles using all the holes for the purpose Repeat around the perimeter of the pool Developed to allow the fitting of the first row of platters of the wall the...

Page 13: ...beams it is mandatory to respect the numbering of the parts The platters are numbered as shown in the photo IMPORTANT Prior to the laying of the first row of beams you must clean up the aluminum prof...

Page 14: ...ensure that this is perfectly leveled Once placed the first row of beams check that they are correctly fitted so that it can ensure a perfect assembly of the rest of the structure Place the first row...

Page 15: ...eams fit on top of the beams n 1 Beam n 2 Base Structure Panel BEAM N 2 2nd row ATTENTION Before placing the sleepers apply a silicone cord as indicated for the first row on the top of the sleepers Th...

Page 16: ...apply a dot of silicon between the beam and the aluminum profile CAUTION A defective fixation may cause cracks in the beams thus is not covered by the warranty The 2nd row of beams is installed all a...

Page 17: ...build the wall of the pool from the 2nd to the 6th row The next chapter will deal with the placement of the panel where the outlet nozzle and the skimfilter will be inserted Placement of platter n 2 t...

Page 18: ...onally the projector it should be in the 4th row The beam n 4 should be placed just below the future location of Skimfiltre BEAM N 4 OUTLET NOZZLE ATTENTION In case of installing a projector you must...

Page 19: ...er wall The beams are fitted and fixed in the same way as the previous rows IMPORTANT As in previous rows it must be applied before placing beam n 3 a bead of silicon through the whole length in order...

Page 20: ...eams are placed on each side of skimfiltre occupying the space of the 5th to the 7th row and are identified with n 5 Between the two beams it is placed a steel panel for fixing the skimfiltre Placemen...

Page 21: ...eel supports are fixed with the nuts and bolts supplied in the kit using appropriate tools Corner coping support Ladder coping support Using the previous method the corner copping support is attached...

Page 22: ...rew the panels Once you have screwed all steel panels apply the aluminum adhesive tape to hide the screw head 1 Apply aluminum tape between the steel panels and coping metal support parts 2 also on th...

Page 23: ...The R15 corner is installed in the corners of the pool between the previously installed angle bracket W and the profiles of the pillars The installation of the W angle is carried out in the 4 corners...

Page 24: ...e as shown in the figures Start by applying a bead of silicon on the coping metal support on the inside edge of the pool Using a drill machine and a steel drill of 3 5mm make a hole every 20 cm then p...

Page 25: ...hment of the upper wall n 1 To fit the two parts put glue provided with SKIMFILTRE on part n 1 and part n 2 as shown in the photograph ATTENTION When applying the two parts of the Skimfiltre make sure...

Page 26: ...By the external side tighten the nut 2 Placement of the outlet nozzle 1 2 ATTENTION If your pool was delivered with a projector as an option proceed to install using the same method used for the place...

Page 27: ...ON OF SKIMFILTER TO THE PUMP 17 Pump and Hydraulic system connection IMPORTANTE It is essential that the filtering system is in conformity to standard C 15 100 which requires that all electrical equip...

Page 28: ...THE PUMP CONNECTION OF THE PUMP Follow the same indications as for the Skimfiltre After having made the connection of all accessories to the pump refer to professional service to make the electrical c...

Page 29: ...Then perform the landfill until the steel base frame is completely covered approx 52 50 cm 18 Landfill around the pool 27 52 50 cm 52 50 cm Landfill...

Page 30: ...it overlap and finish with the application of tape over the joints of the different elements Also apply the tape around the pool on the geotextile carpet and steel wall Proceed to the placement of th...

Page 31: ...lling the liner you must put the joints of the Skimfiltre and outlet nozzle IMPORTANT An outside temperature of at least 20 degrees is necessary for the placement of the liner We recommend that you re...

Page 32: ...ng of the pool help the liner position correctly Stop the filling has soon the water level is 30 cm from the middle of the mouth of Skimfiltre Reaching this point of water and after stopping water fil...

Page 33: ...ns After installing the liner and filling the pool up to 30 cm from the middle of the mouth of the skimmer you should locate the previously placed joints on the outlet nozzle and Skimfiltre Then overl...

Page 34: ...the copings you need to keep verifying if they are being leveled If you wish could do the coping joints with a special silicon not supplied with the kit Placing the coping IMPORTANT First place all t...

Page 35: ...er place indicated for such Mounting of stainless steel ladder After fixing the indoor outdoor stainless ladder the pool is ready for the first baths ATTENTION For an above ground pool remove the outs...

Page 36: ...ust The water level It is imperative to check that the aspiration openings are not clogged We advise you to stop filtering during the maintenance of the filtration system It is imperative to quickly r...

Page 37: ...utes and wipe with a sponge During high season you should clean the cartridge at least once a month and each time you use the vacuum cleaner By the end of the high season if you winter your pool you m...

Page 38: ...wer causing green water and deposits of calcareous With the analysis kit supplied you may check once a week the pH level The pH levels must be imperatively situated between 7 2 and 7 6 This is conside...

Page 39: ...ettable moments in family RESTART AFTER THE WINTERIZING SPECIAL CASES 1 First make an analysis of the Ph and the chlorine in the water 2 Filtration must work continuously over 24h until the water beco...

Page 40: ...c Acts of vandalism such as voluntary cuts The cutting of metals near the swimming pool A careless control of PH and a PH level under 7 cause the appearance of wrinkles in the liner If the chlorine le...

Page 41: ...ling complaints or warranty claims fill out the form on the site www naturalisrp com and return to the respective point of sale AFTER SALES SERVICE Structure 10 degressive years for the walls and surr...

Page 42: ...elle est interdite sans autorisation expresse de celle ci Toute infraction sera punie conform ment la loi en vigueur Este projecto propriedade da R P industries sendo expressamente pro bida a sua repr...

Page 43: ...the hung profile and steel plate Screw M6x16 nuts for fixing of the triangular reinforcements Scale Date Retangle 2 90x7 145m Interior 1 50 Ref Surface Per meter 17 06 2020 2 Volume 3 Des 20 72m 20 0...

Reviews: