Before assembling, proceed to clean the slab to eliminate all kinds of impurities (sand, twigs, leaves, ...).
The slab should be smooth without irregularities and properly leveled to allow the correct assembly of the pool.
On the concrete slab perform marking the route of
the pool. A first marking finds the center point of the
concrete slab
(
0)
.
From points
1
and
2
draw two parallel lines the
A / B
over the entire length of the concrete slab.
From the points
3
and
4
draw two parallel lines about
1/2
the entire width of the concrete slab.
Then confirm with the corresponding diagonal
measurement 5,167 m.
Perform marking of points
3
and
4
distanced 1,574m
from points
A
and
B
respectively.
With these points, you will obtain the location for the first
pillars.
Perform marking of points
A
and
B
separated 2,982m
from the center of the pool
(0).
Repeat to get points 1
and 2 with a distance of 2,166m from the center of the
pool (0).
(0)
(0)
(0)
(0)
4
Marking the layout of the pool
IMPORTANT:
The assembly of the pool should be performed after complete drying of the concrete slab (2/3 weeks).
Dimensions shown are interior dimensions.
6
B
B
B
B
E
F
5,167 m
2,982 m
A
A
A
A
A
C
D
2,982 m
B
2,166 m
1
1
1
1
2,166 m
2
2
2
2
1,574 m
3
3
4
4
1,574 m
5,167 m