14. Glazing

It is recommended that a waterproof sealant is applied around the edge of the glazing before fitting. Place window pane on the inside of the window frame, nail the beading into
position using 3 x 25mm nails for each vertical bead and 2 x 25mm nails for each horizontal bead.  

13. Latch door handle and towerbolt hole 

Position the Latch door handle about half way up the door as shown in diagram. Mark the position of the holes on the door. Remove the latch and draw two lines connect-
ing opposite corners, drill a 12mm diameter hole where the two lines cross. Put the latch bar in the hole on the back of the latch, then reposition the latch (putting the bar
through the drilled hole), attach using 4 x 19mm black screws. On the other side of the door fit the inside door handle to the bar  then using 4 x 19mm black screws attach
the handle to the door. On the front of the other door position the latch holder so that it holds the latch horizontal. Once in position attach to the door with 2 x 19mm black
screws. With the doors shut, drop the lower tower bolt and mark where it touches the floor. Drill a 12mm hole in the floor for the bolt to fit in. 

Window frame

Window pane 

Wooden beading

25mm

19mm

Drill

19mm

Drill

12mm diameter hole

Position the latch
door handle  about
half way up the door
and mark the screw
holes. 

12mm diameter hole

Gloves

wear protective gloves
while handling glazing.

Note

It may be necessary
to shorten the latch

bar to 60mm.

We constantly improve the quality of our products,
occasionally the components may differ from the
components shown and are only correct at time of
printing. We reserve the right to change the
specification of our products without prior notice.

If in doubt of any aspect regarding the assembly, use or safety of your building please contact us :

Help Line (Normal Office Hours)  01829 261121

ROWLINSON GARDEN PRODUCTS LIMITED
Green Lane 
Wardle Nr.Nantwich
Cheshire
CW5 6BN

2011 © Rowlinson Garden Products Ltd

Important information - retain for future reference

To 

VALIDATE

the guarantee: Shiplap buildings come ready stained but this is only a preparatory treatment. the building must be properly treated with a recognised external

wood preserver 

WITHIN 3 MONTHS

of assembly and 

RE-TREATED ANNUALLY  

thereafter.

Adequate provision must be made to ensure ground contact is avoided and air is able to circulate underneath the building.

Placing the building on a concrete pad or slab base is acceptable provided that the building is not allowed to sit in pooled water during wet conditions.
If the building is to sit on   or grass it 

MUST

be erected on pressure treated wooden 50mm x 50mm or similar bearers 

(These are not supplied in the kit).

Rowlinson Garden Products recommend using pressure treated bearers with all buildings on any type of base.

Timber Information.

As timber is a natural material, there are certain weather conditions that may affect the materials properties. In times of excessive dry spells the material may lose some of
its internal moisture causing a certain degree of shrinkage on a panel and in periods of excessive rain there will be a certain amount of swelling throughout the wooden panels.
This process can not be avoided. If you have problems with certain boards shrinking in dry spells try to decrease the amount of direct sunlight on the building or the amount
of air passing over the building. During hot spells spray water directly onto the panels with the aid of a garden hose.

Summary of Contents for Arley Summerhouse

Page 1: ...panels 2 5 Left door 1 6 Right door 1 7 Apex panels 2 8 Front right back left roof panel 2 9 Front Left back right roof panel 2 10 Middle roof panel 2 11 Roof purlins 36 x 29 x 2050mm 4 12 Cover strip 48 x 12 x 1690mm 7 13 Kick strip 38 x 12 x 1360mm 1 14 Window 2 15 Glazing 370 x 264mm 24 16 Glazing 190 x 370mm 6 17 Window beading 375mm 60 18 Window beading 250mm 48 19 Window beading 165mm 12 20 ...

Page 2: ...25mm View from inside of window 1 Floor Prepare a level area for the summerhouse to sit Attach three wooden or similar bearers of size 50 x 50 x 2050mm to each of the floor sections not supplied in kit Place the two sections in position butted up next to each other Attach four wooden or similar bearers of size 50 x 50 x 840mm to the verandah floor Panel frames rest on floor Panel cladding overhang...

Page 3: ... screws Attach to the front apex the door frame beading using 3 x 25mm nails Secure it to the bottom of the framing up against the cladding 560mm from the left hand front panel as shown below Shiplap cladding Apex frame 560mm Door frame bead ing 25mm 40mm Drill 6 Roof purlins Insert the four roof purlin into the rebates in the apex sections Fix in place at the ends of the purlin using 2 x 50mm scr...

Page 4: ...frame Important It is recommended to drill pilot holes for all screws in this section with a 2mm drill bit Drill It is recommended to drill pilot holes for all screws in this section with a 2mm drill bit Drill 35mm 55mm Roof panels must overhang the back of the building by 55mm Important 9 Roof Lift a rear roof panel into position at the back of the building hooking the roof batten over the upper ...

Page 5: ... x 10mm felt nails evenly spaced Tension the felt over the roof and secure along the upper edge using 8 x 10mm felt nails Repeat this for the second piece of felt on the other half of the roof Once the two pieces of felt are in place take the 3m ridge felt roll and place over the apex of the roof making sure it sits centrally over the roof ridge and overlaps the other two felt pieces attach using ...

Page 6: ...e right to change the specification of our products without prior notice If in doubt of any aspect regarding the assembly use or safety of your building please contact us Help Line Normal Office Hours 01829 261121 ROWLINSON GARDEN PRODUCTS LIMITED Green Lane Wardle Nr Nantwich Cheshire CW5 6BN 2011 Rowlinson Garden Products Ltd Important information retain for future reference To VALIDATE the guar...

Reviews: