3. Wall panels

Position two plain panels on the corner of the floor as shown. Note how the panel frames sit on the floor with the panel cladding overhanging the floor edge. Ensure square,
secure the two panels together using 3 x 50mm screws. Screw through the frame of the side wall panel into the frame of the back wall panel. Place a third plain panel along
the back wall, push it up against the other panel and with the two panels level secure together using 3 x 50mm screws through the frame of the first panel into the frame of
the second. Continue adding the rest of the panels following the diagrams below.

Front panels

Back wall

Side wall

2. Fitting the windows

Lay the window panel on the floor. Fit two hinges in the rebates on the top of the window as shown in the diagram using 2 x 25mm screws per hinge, stand the hinge end
of the window on the window panel, making sure it is centred at the top of the window opening. Open the hinges and secure them to the window frame using 3 x 25mm
screws per hinge. On the inside of the window panel fit the window stay and its two posts using 6 x 25mm screws as shown in the diagram.

25mm

25mm

25mm

View from inside
of window

1. Floor

Prepare a level area for the summerhouse to sit. Attach three wooden or similar bearers of size 50 x 50 x 2050mm to each of the floor sections (not supplied in kit). Place the
two sections in position butted up next to each other. Attach four wooden or similar bearers of size 50 x 50 x 840mm to the verandah floor.

Panel frames
rest on floor.

Panel cladding
overhangs floor
edge.

50mm

Back wall

Side wall

It is recommended to drill pilot
holes for these screws with a 2mm
drill bit before assembly.

50mm

Drill

Use this diagram to check the

correct orientation of the

corners

Important note

To 

"VALIDATE"

the guarantee, adequate provision must be made to ensure ground

contact is avoided and air is able to circulate underneath the building.

Placing the building on a concrete pad or slab base is acceptable provided that the
building is not allowed to sit in pooled water during wet conditions.

If the building is to sit on soil or grass it 

MUST

be erected on pressure treated

wooden 50mm x 50mm or similar bearers 

(These are not supplied in the kit).

Rowlinson Garden Products recommend using pressure treated bearers with all build-
ings on any type of base.

When laying the floor, it is

important to note the T&G floor

boards must run from the front

of the building to the back. 

Important

Important

Side wall

Summary of Contents for Arley Summerhouse

Page 1: ...panels 2 5 Left door 1 6 Right door 1 7 Apex panels 2 8 Front right back left roof panel 2 9 Front Left back right roof panel 2 10 Middle roof panel 2 11 Roof purlins 36 x 29 x 2050mm 4 12 Cover strip 48 x 12 x 1690mm 7 13 Kick strip 38 x 12 x 1360mm 1 14 Window 2 15 Glazing 370 x 264mm 24 16 Glazing 190 x 370mm 6 17 Window beading 375mm 60 18 Window beading 250mm 48 19 Window beading 165mm 12 20 ...

Page 2: ...25mm View from inside of window 1 Floor Prepare a level area for the summerhouse to sit Attach three wooden or similar bearers of size 50 x 50 x 2050mm to each of the floor sections not supplied in kit Place the two sections in position butted up next to each other Attach four wooden or similar bearers of size 50 x 50 x 840mm to the verandah floor Panel frames rest on floor Panel cladding overhang...

Page 3: ... screws Attach to the front apex the door frame beading using 3 x 25mm nails Secure it to the bottom of the framing up against the cladding 560mm from the left hand front panel as shown below Shiplap cladding Apex frame 560mm Door frame bead ing 25mm 40mm Drill 6 Roof purlins Insert the four roof purlin into the rebates in the apex sections Fix in place at the ends of the purlin using 2 x 50mm scr...

Page 4: ...frame Important It is recommended to drill pilot holes for all screws in this section with a 2mm drill bit Drill It is recommended to drill pilot holes for all screws in this section with a 2mm drill bit Drill 35mm 55mm Roof panels must overhang the back of the building by 55mm Important 9 Roof Lift a rear roof panel into position at the back of the building hooking the roof batten over the upper ...

Page 5: ... x 10mm felt nails evenly spaced Tension the felt over the roof and secure along the upper edge using 8 x 10mm felt nails Repeat this for the second piece of felt on the other half of the roof Once the two pieces of felt are in place take the 3m ridge felt roll and place over the apex of the roof making sure it sits centrally over the roof ridge and overlaps the other two felt pieces attach using ...

Page 6: ...e right to change the specification of our products without prior notice If in doubt of any aspect regarding the assembly use or safety of your building please contact us Help Line Normal Office Hours 01829 261121 ROWLINSON GARDEN PRODUCTS LIMITED Green Lane Wardle Nr Nantwich Cheshire CW5 6BN 2011 Rowlinson Garden Products Ltd Important information retain for future reference To VALIDATE the guar...

Reviews: