Page
2 of 7
INSTALLATION PROCEDURE
1
3. Using three (3) clamps per side attach the rail to the bed, position the clamps adjacent to each of the black
rail spacers. (Tip: Mount the center clamp first but do not tighten completely. This will give you the ability to
adjust the rail as the outer clamps are attached)
4. Tighten the clamps using a 1/2” socket. Install the bulkhead seal to the top of the front rail of the truck bed
and cut to length.
3
Warning!
Do not overtighten the clamp
assembly. A torque wrench is not necessary.
If preferred, torque is apx 120 inch lbs.
Warning!
Clamps must be checked periodically
for tightness. Failure to do so could result in
damage to you or your property.
4
1/2”
1. Attach both left and right side rails to the truck bed. The end of the mounting rail with the drain tube fitting
will go towards the cab of the truck, position flush to bulkhead.
2. Position the top edge of mounting rail flush to 1/8” above the top edge of your truck bed rail.
2
Stick each one of the rubber filler strips to the bed rail, adjacent to each rail spacer (black piece with clamp written on it), prior
to installing the mounting rail. Tip: Lay the cover mounting rail on top of the truck bed rail, drain tube towards the cab, to help
indicate position of the filler strips. The filler strips should be mounted on the lower portion of the bed rail.