26
Installation, Commissioning and Maintenance Manual
16.0 Periodic Maintenance
PM-LP-001
Page:1/1
Component:
Single-acting actuator
Task:
Cleaning
Equipment, Tools, Materials:
Air Compressor
Project documentation (Design and Operating pressure values)
Warnings:
Preliminary Operations:
Description:
Remove electric and pneumatic supply before proceeding.
1. Remove dust from actuator external surface with a dust rag and by blowing air
Do not polish/rub non-metal surfaces with a dry cloth. The tools and cleaning procedures must not produce sparks or create
adverse conditions in the environment during maintenance operations, to prevent potential explosion hazards.
Prevent electrostatic charges in potentially explosive areas.
A4
US
US
A4
US
A4
US
A4
Summary of Contents for LP/S Series
Page 89: ...Keeping the World Flowing 89...