23
PM-CQP-002
Page:1/1
Item:
Actuator
Task
: Functional test
Equipment, Tools, Materials
:
Chronometer
Project documentation (required stroke times)
Warnings
:
Preliminary Operations
:
Description:
Note: Actuator must be connected to the pneumatic power supply to perform the following test.
1.
Operate the actuator
2.
Perform one closing stroke and one opening stroke
3.
Verify actuator’s movement is smooth and linear.
4.
Verify stroke time(s) are as required.
Actuator discharges medium gas during normal operation. Pay attention during test. Do not stand near exhaust port.
In case of stroke times out of required range refer to Troubleshooting ID 3, page 19, for solutions.
In case of problems contact Rotork Fluid Systems Customer Service