background image

UNLOADING THE ROTTERA 2450 TANK WITH EXCAVATOR 

 
 

You will need:   
 

-

 

EXCAVATOR 
 

-

 

CONSTRUCTION STRAPS / SLINGs 

 

 
 
Procedure:  
 
 
Open the top and side wall of the truck. Remove the extensions which are freely loaded on 
top of the tank.  
 
Attach the lifting slings on four (4) locations which are marked on the tank. (Marks (4) are on 
both side of the tank).  
 
With the Excavator slowly lift the tank (picture 2 below) 
 
 

 

Picture 1 (Location of the lifting locations must be marked on the tank) 

 
 
 

Reviews: