13
x
Service log
71
FA ROTEX A1 BO - 10/2007
13
Service log
Please enter the maintenance work carried out and the measured values in the service log.
Maintenance jobs
Initial start-up
1
st
service
2
nd
service
3
rd
service
4
th
service
Leakage testing heating pipe
connections
Leakage testing hot water pipe
connections
Leakage testing oil connection
Visual inspection of electrical
components, testing electrical
connections
Testing the pH value in condensate
drain (enter value)
Function testing and cleaning
condensate treatment unit and drain
Inspection of the flue
gas connection
Cleaning of the combustion
chamber
Cleaning and inspection
of the burner
Oil nozzle change
Used nozzles: Manufacturer/Type
Rechecking burner setting
Checking distance ignition
electrodes
Cleaning sound insulation hood,
boiler panelling, storage tank
Putting the burner into operation and recording measured values
Oil pressure at the burner
Carbon dioxide (CO
2
) in the flue gas
pipe
Oxygen (O
2
) in the flue gas pipe
Carbon dioxide (CO
2
) in the supply air
(ring-shaped gap measurement)
Flue gas temperature in the flue
gas pipe
Temperature of the suction air
Carbon monoxide (CO)
Maintenance confirmed
(Company stamp,
Date, Signature)
Modifications made to the control setting parameters, other remarks on the heating system
Date
Signature
Comments