Installation
65
Waiti
ng
ti
me
To the maintenance-free lubrica
tion
oil is located in the
capsule of the compressor. This oil can get through the
closed pipe system during slan
ti
ng transport. Before
conne
cti
ng the appliance to the power supply you have
to wait 2-5 hours so that the oil runs back into the
capsule.
Electrical connec
ti
on
Before each conne
cti
on check if:
power supply, socket and fusing are appropriate to the ra
ti
ng plate.
the power socket is earthed and no mu
lti
-plug or extension.
the power plug and socket are strictly according.
Connect the plug to a properly installed household socket.
WARNING!
To avoid risks a damaged power cord must be replaced by the customer service (see
warranty card).