Qubex User Guide
Page 15
4.
Remove the four securing screws and remove the assembly
5.
Detach the controller from the assembly by removing the four mounting screws.
Drive Carrier
The drives are mounted in purpose designed caddies. The caddies are designed for hot swap
operation with a damping handle and EMI shielding. Status information is conveyed via light
pipe. Removal of the drive carrier is achieved by pressing on the upper part of the handle.
LCD Panel Connector
Securing Screws