A
s
s
e
m
b
ly
I
n
s
tr
u
c
ti
o
n
s
S
la
n
t-
R
o
o
f
G
re
e
n
h
o
u
s
e
™
V
1
S
p
ri
n
g
2
0
2
1
C
o
p
y
ri
g
h
t
®
R
o
o
s
t
&
R
o
o
t
a
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
L
e
ft
S
id
e
T
ri
a
n
g
le
P
a
n
e
l
Page 07
We're about to find out how flat your ground is...
L2
F1
L1
B3
L4
1
1
2
3
4
5
Flush
Angle & Edge
Flush
2
3.1 Install Left Triangle Panel:
Place the L4 triangle panel on top of L2 and L1 as illustrated
and the using E1 3" T-25 screws, screw down L4 panel tight to L2 and flush in the order of the
1-3 green arrows as shown.
3.2 Position Over L1:
Line up L4 over the top of L1 making flush as shown in FIG 3A and
then install screws 4 & 5 drawing the seam tight.
If the ground is not level and the tops of L2 and L1 are significantly off it will become apparent
in this step. Let the screws draw the assembly tight and remove or add soil under L1 & L2 as
needed to support the assembly.
Fig 3
Fig 3A