A
s
s
e
m
b
ly
I
n
s
tr
u
c
ti
o
n
s
S
la
n
t-
R
o
o
f
G
re
e
n
h
o
u
s
e
™
V
1
S
p
ri
n
g
2
0
2
1
C
o
p
y
ri
g
h
t
®
R
o
o
s
t
&
R
o
o
t
a
ll
r
ig
h
ts
r
e
s
e
rv
e
d
.
R
o
o
f
S
e
c
ti
o
n
1
(
L
e
ft
S
id
e
)
A
tt
a
c
h
m
e
n
t
Page 12
6.1 Slide Side & Back Into Place:
Refer to instructions on page 11 for placement procedure and put in
place Roof Section 1 as illustrated onto left end of greenhouse.
6.2 Square Back to Left Side:
By moving the roof section and pulling in or out back walls and left side
wall, make the back edges and the side edges of walls flush with the roof frame as indicated in
illustrations. Place 3" T25 Screws in back B3 panel and left L4 and L1 side panels as indicated by green
arrows in FIG 6B.
6.3 Align Front Edge:
By moving the front wall in or out, align top of the F4 panel with the beveled front
roof frame piece making the edges flush and install T25 screws as indicated by green arrows in FIG 6C.
Refer to figures and photos 1-4 to orient yourself to the task.
Fig 6A
Left
Side
View
Fig 6B
Back View
Fig 6C
Front View
1
2
3
4
Flush Along Back - Move
Wall in & Out As Needed
Flush Along Side
Move sidewall in and
out as needed to make
flush along entire edge.
Overhang
Flush
Flush Along Front Edge
F4
B3
L4
Install Roof Section 1 (left roof panel)