background image

A

s

s

e

m

b

ly

 I

n

s

tr

u

c

ti

o

n

s

S

la

n

t-

R

o

o

G

re

e

n

h

o

u

s

e

V

1

 S

p

ri

n

g

 2

0

2

1

C

o

p

y

ri

g

h

®

 R

o

o

s

&

 R

o

o

a

ll

 r

ig

h

ts

 r

e

s

e

rv

e

d

 

R

ig

h

E

n

d

 &

 S

e

c

ti

o

n

 3

 R

o

o

f

Page 17

10.1 Install R4 Panel:

 Referencing Step 3 on page 7 repeat the procedure from 

installing the left side triangle L4 panel, to install the right side R4 triangle panel. 
See FIG 10A.

10.2 Install Right Side Roof Section:

 Repeating procedures used in prior roof 

section installation steps, unfold the Right Side Roof Section and slide over the 
back of greenhouse, up the top rail of the R4 panel, and over the top of the F5 
panel. Align all edges and make flush and attach as indicated. Right side roof 
section rests over the top of the middle roof section. See FIG 10A

10.3 Connect Right to Middle Roof Sections: 

Using same procedure as in Step 

8 on page 15, lift and make flush the bottom sides of the frames from the right to 
the middle roof section from inside and screw together.

Fig 10A

R4

F5

Install Right Side
Roof Consistent
With Other Sections

Right Section
On Top Of
Middle
Section

Fig 10B

Make all edges flush

A little tricky! Right triangle and last roof panel.

Starting to look pretty good!

Summary of Contents for Slant-Roof Greenhouset

Page 1: ...any intellectual property and are granting you limited personal use only Do not copy or distribute without written permission of Roost Root We claim all available federal protection for the name Slant...

Page 2: ...Assembly Instructions Slant Roof Greenhouse V1 Spring 2021 Copyright Roost Root all rights reserved Dimensions Page 01 71 1 2 26 1 2 Shown With Optional Solar Panel 125 96 130 143 113 60...

Page 3: ...Assembly Instructions Slant Roof Greenhouse V1 Spring 2021 Copyright Roost Root all rights reserved Conventions Page 02 Front Back Right Left...

Page 4: ...ng or we forgot to package a needed part contact us and we will ship out a replacement part for you at no cost It is common for rough cut cedar to vary in size by up to 1 8 inch and to shrink and swel...

Page 5: ...the AVM Solar Ventilation System then the solar panel is optimally facing South with clear unobstructed view of the sun The more room you leave around your greenhouse the more light that can come in...

Page 6: ...ther sharp tool to create a crevice for the stabilizer to be seated into 1 2 Assemble Back Left Corner Using provided E1 3 T 25 screws your drill and the provided T 25 bit in provided bit holder assem...

Page 7: ...emble the front left corner L2 to F1 as shown in FIG 2 Focus on making bottom and side edges flush and then drive screws as indicated by the green arrows only tight enough to secure the pieces and not...

Page 8: ...nd L1 as illustrated and the using E1 3 T 25 screws screw down L4 panel tight to L2 and flush in the order of the 1 3 green arrows as shown 3 2 Position Over L1 Line up L4 over the top of L1 making fl...

Page 9: ...h the bottom rail of L1 through the aluminum strip Fig 4B Note Take care not to move when you withdraw the drill so the holes stay lined up Insert an E1 screw into the hole you drill and drive the scr...

Page 10: ...as possible See FIG 5A 5 2 Install F4 Panel Place panel F4 on top of panel F1 making sure bottom edges and side edges where F4 meets L4 F1 are as flush as possible Attach using T25 screws as indicate...

Page 11: ...Root all rights reserved Roof Section ID Page 10 Here s how to identify which roof section is which Back Short Wall Front Tall Wall Looking down aerial view Longer is Front Notch Notch Outside Outsid...

Page 12: ...ong side is straightened out over the front 3 Slide Over Into Position After unfolding slide the roof up and into position over the triangle side of the side wall You will use the side triangle as a r...

Page 13: ...e as indicated in illustrations Place 3 T25 Screws in back B3 panel and left L4 and L1 side panels as indicated by green arrows in FIG 6B 6 3 Align Front Edge By moving the front wall in or out align...

Page 14: ...erved AVM Otional Parts ID Page 13 Louvered Vent Panel Slightly Different Standard Model With AVM Option Take Note Treat As Same Treat As Same Even though these parts look different in the coming step...

Page 15: ...later strengthening Let s pick up the pace now that you know what s going on and bite off a few steps at a time 7 2 Install Panel F6 Using T25 screws install panel F6 7 3 Install Panel F7 Using T25 s...

Page 16: ...Front Leading Edge Using T25 screws and carefully standing on at least a 6 foot step ladder or similar drive a screw in the approximate location as illustrated in FIG 8B while pushing up on roof secti...

Page 17: ...9A making top edges flush Fig 9A Fig 9B Flush Bottom Flush Top Edge Top Edge Flush R2 R3 R1 F5 B1 9 4 Install B1 Panel Using provided T25 screws install B1 panel as illustrated in FIG 9B making top ed...

Page 18: ...over the back of greenhouse up the top rail of the R4 panel and over the top of the F5 panel Align all edges and make flush and attach as indicated Right side roof section rests over the top of the mi...

Page 19: ...ffener into the roof frame starting from the middle of the stiffener and working your way out See FIG 11A for pattern Repeat this until all screws for the stiffener are tightly screwed in The stiffene...

Page 20: ...ht with beveled ends facing out and attach to wall using T25 screws as indicated in the illustration Push the wall from the inside or have a helper push the wall from the outside to make the wall flat...

Page 21: ...back wall of the greenhouse The position of the stiffeners is indicated in FIG 13 11 1 Position one of the narrower wall stiffeners centered over the lower wall seam left or right with beveled ends fa...

Page 22: ...tch as indicated in FIG 14A such that the sliding bolt goes into the hole in the door handle when it is in the closed position Slide back and forth to confirm smooth operation While holding the gate l...

Reviews: