![ROOMS TO GO KIDS IVY LEAGUE 2.0 3461326P Manual Download Page 59](http://html1.mh-extra.com/html/rooms-to-go/kids-ivy-league-2-0-3461326p/kids-ivy-league-2-0-3461326p_manual_1485509059.webp)
ASSEMBLY INSTRUCTIONS
Assemble step bunk unit and extension kit, aligning
inside and outside patterns and holes.
Fasten and
make sure all bolts are tightened completely
.
Install slats, one on each end, two equally spaced in the middle,
1/0/1900
Page 5
9
of
72
Assemble top side rails.
then fasten with 1 1/4" screws.
Assemble guardrails and tighten all bolts.
Assemble side rails
MAKE SURE ALL BOLTS ARE TIGHTENED COMPLETELY
MAKE SURE ALL BOLTS ARE TIGHTENED COMPLETELY
STEP 24
B
STEP 22
A
C
C
STEP 25
F
STEP 26
E
STEP 23
C
A
A
B
B
A
A
A
A
B
A
A
A
A
A
A
STEP 27
E
G