Maximum Super Takedown
Installation, Operation & Programming Instructions
www.rontan.com
Rev. 0.3
Page 16
4.2 Migfoot parts
ITEM
QTY
DESCRIPTION
1
2
Migfoot Base plate
2
4
Rubber foot Pad
3
4
A6.4 flat washer
4
4
M6 Stainless steel nylon insert lock Nuts
5
1
5/16-
18 x 2” Stainless steel tap bolt or 5/16-18 x 4” Extended stainless steel tap bolt
6
1
Roof mounting bracket
7
4
M6 x 16mm Stainless steel tap bolt
8
1
Cylinder nut
6. Polling
Polling is an important procedure to ensure the lightbar operation. When replacing an
LED board or module in a Rontan S-Series product, you must perform a Polling upon
installation to allow the lightbar to recognize and include the new application.