IL-MO-044 Rev. 1 04/2010
Double Drawer Unit – QM1
Insulated
Pag. 3 / 6
PROFESSIONAL INSTALLATION REQUIRED
Notes and Installation Tips
ALWAYS USE PROTECTION GLOVES AND EYE SAFETY GOGGLES:
Use care and always use protection gloves and safety goggles during in-
stallation and care. Because the drawers may have sharp edges, if not
handled with care they can cause cuts and abrasions.
Tools you will need : Power screw driver, manual screw driver, level, tape
measure.
Carefully unpack cabinets making sure not to scratch stainless steel fronts
and not to loose or misplace any components.
DO NOT remove polyethylene protective coating until installation is com-
plete.
Remove all drawers before installation. This will make cabinet easier to lift
and install and give access to installation hardware.
This product is made only for application on a subframe, which can be
made in different materials (wood, plastic, alluminium) into a wall structure
(Fig. 1)
Do not use the drawers as ladder. This would be dangerous for you and can
cause the item to break.
Fig. 1
a
b
Subframe