background image

Step 6 – Fixing the Door to the Wall Profiles

1. Centralise the door between both wall profiles.  Both wall profiles must overlap the door by at least 18mm.

2. Adjust the door within its own main frame to ensure the gap between the top and bottom of the door and the horizontal main

frame  is  parallel.    To  achieve  this  adjustment,  push  the  main  vertical  door  frame  from  the  top  further  over  the  wall  profile
following the arrows. This will ensure the door lifts up away from the bottom of the horizontal main frame.

Important: It is critical that door opens and closes correctly prior to drilling.

3. Drill through the pre-drilled holes of the wall profile into the door with a 2.5mm drill bit (supplied).

•      E

En

ns

su

urre

e  tth

he

e  d

do

oo

orr  iis

s  c

co

om

mp

plle

ette

ellyy  vve

errttiic

ca

all  ((tth

he

e  b

bu

ub

bb

blle

e  s

sh

ho

ou

ulld

d  b

be

e  iin

n  tth

he

e  c

ce

en

nttrre

e  o

off  tth

he

e  ttw

wo

o  lliin

ne

es

s  o

on

n  tth

he

e  s

sp

piirriitt  lle

evve

ell))

4. Using a screw driver screw-fix the enclosure to the wall profiles using the supplied No4 x ¼” pan head screws.

Important: If the door does not hang vertically, you have further adjustment at the top of each wheel assembly. Using the Allen

key (supplied) turn the adjustment screw. Turning the adjustment screw clockwise will lift the door, and turning the 
adjustment screw anti clockwise will lower the door.  Do not over tighten the adjustment screw; you have 5mm of 
adjustment on each wheel.

ET Sliding Door:CSP  4/5/10  11:33  Page 7

Summary of Contents for ET10

Page 1: ...ss panels when being factory assembled IMPORTANT INFORMATION Roman s toughened glass is completely safe for use in our shower enclosures and bath screens providing our products are installed according to our guidelines It is important to note that the glass must not be mounted or pinched in such a way that would cause a stress point to develop in the glass In addition it must not be subjected to a...

Page 2: ...ment please see table above I Im mp po or rt ta an nt t The above dimensions include tiling you must ensure you work within the above measurements failure to do so will result in the door not fitting into the alcove Enclosure Minimum Maximum Size Alcove Size Alcove Size Prior to installing attempting to fit your alcove door measure the exact opening of the alcove top middle and bottom after tiling...

Page 3: ...ld be sealed using a good quality bathroom sealant Spray the seal and joints with the shower head and check for leaks when the silicon has cured Check the plumbing for leaks Do not plasterboard over the tray Do not grout the tiles when the enclosure has been fitted as the grout may discolour the aluminium profiles Make sure the tray is installed as per manufacturer s instructions When all of the a...

Page 4: ...it meets the tiled wall 6 Screw fix the wall profile to the wall using the 40mm screws supplied 7 Apply a bead of sealant to the inside of the wall profile at the bottom where it meets the tray top Important The wall profiles must be completely vertical the bubble should be in the centre of the two lines on the spirit level The sealant must be applied in steps 4 and 6 failure to follow out this pr...

Page 5: ...to your panel instructions This wall profile will be fitted on the opening side of the door 1 Position the wall profile approx 15mm in from the front of the tray 2 Using a pencil mark the locations for the drill holes through the lip of the wall profile using the holes as a guide 3 Drill the holes using 6mm masonry drill bit not supplied Push the wall plugs supplied Important The 2nd Wall profile ...

Page 6: ... that is already fitted to the wall 3 Insert the loose wall profile into the other end of the door and push the wall profile as far as possible into the door 4 The 2nd wall profile can now to be pushed back to the wall and secured through the lip using the 40mm screws supplied into the wall plugs that were fitted during Step 3 Important The wall profiles must be completely vertical the bubble shou...

Page 7: ...e door with a 2 5mm drill bit supplied E En ns su ur re e t th he e d do oo or r i is s c co om mp pl le et te el ly y v ve er rt ti ic ca al l t th he e b bu ub bb bl le e s sh ho ou ul ld d b be e i in n t th he e c ce en nt tr re e o of f t th he e t tw wo o l li in ne es s o on n t th he e s sp pi ir ri it t l le ev ve el l 4 Using a screw driver screw fix the enclosure to the wall profiles us...

Page 8: ...ality sealant seal both sides of the wall profile inside and outside vertically where it meets the tiled wall 4 Seal the base of the corner panel to the wetroom floor tray from the outside only Very important Failure to follow the procedure in lines 3 4 may result in serious water damage and will not be covered under the terms of the guarantee Do not seal along the base of the product from the ins...

Page 9: ...eference Number these numbers can be found on the guarantee card SPARE PARTS If you need to replace any damaged parts please see illustration below for parts list then call Customer Relations on 01325 328033 328034 No Description 1 Wall Profiles 2 Frame Cover Trims 3 Screw Cover Trims 4 Top Caps 5 Vertical Main Frame 6 Bearing Assembly 7 Door Stop 8 Door Glass 9 Vertical Door Seal 10 Vertical Pane...

Page 10: ...Check to see if both wall profiles have been sealed vertically inside and outside where they meet the tiled wall Step 7 6 Check that the base of the enclosure hasn t been sealed to the tray top on the inside of the cubicle Important This enclosure should be water tested conforming to BS EN 14428 ENCLOSURE 1 Check that the enclosure has been fitted onto a tiled wall or a similar sealed surface ALIG...

Reviews: