Installation
Rough-In
STEP 3
A.
Line ceiling with plasterboard, making sure the bottom of the In-
Ceiling Bracket is flush with the plasterboard. Make adjustments to
In-Ceiling Bracket if necessary.
Dimensions are approximate. Information in this technical overview is representative of the product available at the time of printing.
y of continuous product development, the design and specifications depicted are subject to change without notice.
Ple
ticulars with your client advisor prior to purchase.
Note: Plasterboard must not protrude
below the In-Ceiling Bracket.
B.
Neaten up the plasterboard edge using a cutter.
Always remember to recycle.
C.
Install P25 rondo angle around the edge of the hole,
plaster and finish to bottom of bracket.
Plaster
P25