I
nstallation
Rough-In
Dimensions are approximate. Information in this technical overview is representative of the product available at the time of printing.
y of continuous product development, the design and specifications depicted are subject to change without notice.
Ple
ticulars with your client advisor prior to purchase.
NOTE
Prior to installation of product please make sure allowances have been made for:
Water connection 1x mixed water point.
Timber
Studs
208mm
338mm
STEP 1
A.
Using the In-Ceiling Bracket as a guide build a
secure stud frame in desired location.
B.
Insert In-Ceiling Bracket into stud framework
,
a
llowing for the finished ceiling face to be
flush with the base of the bracket.
STEP
2
Securely fix the In-Ceiling Bracket to the
studded framework
, a
llowing for the finished
ceiling face to be flush with the base of the
bracket
.