
E1001A-171107
13
For reviewing results, go to ‘Data Files’, the select ‘Calibration’ or ‘Field Test’. Then
select the specific file you want to see.
5
SATURATING THE EQUIPMENT
5.1 SATURATING THE CONTROL BOX CYLINDER
1. Connect the short length of flexible tubing to the "Fill" quick connect port No. 4. Push on
the connector until you hear a ‘click’.
2. Place the free ends of the saturation tubings in a small container
– we suggest a 1
gallon plastic bottle - of clean water or antifreeze solution. It is imperative to maintain
the ends of the tubings submerged during the saturation. Otherwise, air will enter the
TEXAM
e
. You may tape the tubings to the bottle for ensuring that.
3. Set valve No. 6 on "FILL".
4. Turn the small crank handle clockwise to bring the cylinder piston to its uppermost
position corresponding to about 1732 cc on the counter. The uppermost position is
reached when resistance is felt when cranking. Stop cranking then for not damaging the
equipment. While the piston is rising, the air in the cylinder is coming out from the tubing
connected to the port No. 4. Bubbles should be observed in the bottle.
Select for viewing info
about the calibration /
test
Select for viewing data