![Rockwell Automation Reliance electric FlexPak 3000 Installation Instructions Manual Download Page 15](http://html.mh-extra.com/html/rockwell-automation/reliance-electric-flexpak-3000/reliance-electric-flexpak-3000_installation-instructions-manual_1475510015.webp)
Installing the Enhanced Field Supply Kit on 3.0 HP to 60 HP @ 460 VAC (1.5 HP to 30 HP @ 230 VAC) Drives
2-5
2.5
Replacing the Drive Fuses
Step 1. Remove the three fuses labeled 6FU, 7FU, and 8FU from the drive’s fuse
block. See figure 2.5.
Step 2. Install the three provided 25 A, 600 V fuses (P/N 64676–30M) in the fuse
block in positions 6FU, 7FU, and 8FU.
Step 3. Locate the replacement fuse table on the back of the carrier. Attach one of
the adhesive fuse rating labels (P/N 179540) over each of the places
indicated in figure 2.6.
Figure 2.5 – Field Fuse Location (3 HP to 60 HP @ 460 VAC Drives)
Figure 2.6 – Attaching Replacement Drive Fuse Labels (3 HP to 60 HP @ 460 VAC Drives)
8FU
7FU
6FU
Top View
600V 25A