Chapter 3 Drive Electrical Interconnection
Figure 31 - Interconnection Ground
Complete the Installation
1. Inspect the interior of all cabinets carefully for hardware or tools that
may have been misplaced.
2. Check and verify that no hardware or foreign material has fallen in the
secondary windings in the Isolation Transformer cabinet.
3. Check that all mechanical work has been completed properly. All barriers
and guards that may have been removed must be reinstalled.
4. Check that all electrical connections have been made and torqued as
specified.
5. Verify that the safety circuit is working properly (see
6. Reinstall all cabinet back plates.