background image

Distributed by Rockler Companies, Inc. 

Medina, MN 55340

8

Sample Sign 

The above images detail the required steps to complete a STATE PARK sign. The highlighted red letters are 

routed in each pass.

Finished Sign

Fourth Pass

First Pass

Check Rockler.com for updates. If you have further questions, please contact our Technical Support Department at 1-800-260-9663 

or [email protected]

Second Pass

Third Pass

Rev 10/17

Summary of Contents for Interlock Signmaker’s Templates State Park

Page 1: ...ate Park Instructions Review full manual instructions prior to use for important safety information Always check Rockler com to confirm that you are using the most recent manual version for your produ...

Page 2: ...precautions outlined in this manual prior to use Maintain these instructions and warnings as long as you own the product Keep this booklet in a place where it will be readily available for reference T...

Page 3: ...plunge router and appropriate guide bushing and router bit rout out each individual character For deeper cuts it is best to make multiple passes increasing the depth each time This will eliminate dust...

Page 4: ...ample A 1 and A 2 In this example we will route LODGE O 1 D 1 and G 1 will be used in the first pass Fig 2 2 Securely attach templates to desired surface As added security mark location of templates u...

Page 5: ...5 Notch location Fig 4 Sample LODGE sign Second Pass Fig 3 Sample LODGE sign...

Page 6: ...Letter Combos Replace the middle letter with Spacer 2 for 1st pass Four Letter Combos Replace the 2nd letter with spacer 2 and replace the 3rd letter with spacer 1 for 1st pass Kerning Chart Fig 5 Two...

Page 7: ...7 Fig 6 Three Letter Combos Fig 7 Four Letter Combos...

Page 8: ...teps to complete a STATE PARK sign The highlighted red letters are routed in each pass Finished Sign Fourth Pass First Pass Check Rockler com for updates If you have further questions please contact o...

Reviews: