
ROBERTS GORDON
®
T F-S
E RIE S
S
U BMI TT AL
S
HEE T
© 2004 Roberts-Gordon
APPLI CAT IONS, ENGIN EE RING AND DE TAI LE D GUIDANCE ON SYST EMS DE SI GN, I NSTALL ATION AND PRODUCT PE RFORMANCE I S AVAIL ABL E UPO N REQUE ST. ROBERTS GO RDON
®
PRODUCTS ARE TO BE
INSTAL LE D ONLY I N ACCOR DANCE WIT H L OCAL L AW S, CODES AND RE GULAT IONS, AND ONLY BY A CONTRACTO R QUALI FIE D IN THE INST AL LAT ION AND SE RVICE OF GAS-F IRE D HEAT ING E QUIPMEN T.
Vertical Ventilation 6" (15 cm) Pipe
Flexible Boot Installation (Common Vent)
Vent
Terminal
6" (15
cm
) S
ingle
W
all
Pipe
Burner
Tube
Roof
Fle
x
ible
Boot
6" (15
cm
)
Vent
Pipe
Vent
Tee
Boot
Clamp
Plan
View
*
IMPORTANT
Compress
boot
on
installation
to
allow
at
least
2
" (5
cm
)
of
movement
on
each
side
for
thermal
e
x
pansion
of
tube
away
from
the
tee.
*
Descri ption
Part Num ber
Vent Cap 6" (15 cm)
90502302
6"
18"
11"
6" (15 cm)
Tube
8" ( 20 cm) long Flexible
Boot Compressed
to 6" (15 cm) long
Vent Tee
3.5"
(9 cm)
3"
(8 cm)
3/4" (2 cm)
Rolled Sleeve Installation
for Common Vent
Expansion
Direction
3"
(8 cm)
Descri ption
Part Num ber
Rolled Sleeve
09080000
Flexible Boot 4" (10 cm)
91412800
Boot Clamp 4" (10 cm)
91901300
Vent Tee - 4" Dia. x 4" Dia. x 6" Dia.
91916100