UHD S
TANDARD
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
34 of 57
front of the t
u
bes
w
hich may indicate b
u
rner over
firing or persistently lo
w
air flo
w
s.
13.4 Gas Valve Maintenance
No reg
u
lar maintenance is req
u
ired on this device.
To change gas control valves,
See Page 42, Section
15.1
.
Do not repair or disassemble
g
as valve.
Replace fa
u
lty gas valves
w
ith replacement parts
sold and s
u
pplied by Roberts-Gordon LLC.
13.5 Flue Blower
The fl
u
e blo
w
er sho
u
ld not req
u
ire maintenance.
Ho
w
ever, if the air press
u
re s
w
itch is ca
u
sing b
u
rner
locko
u
t, then remove the fl
u
e blo
w
er from the vent
box by
u
nscre
w
ing the scre
w
s at the mo
u
nting plate.
Scre
w
q
u
antity
w
ill vary by model size. Remove the
scre
w
s attaching the mo
u
nting plate to the fan inlet.
See Page 48, Section 15.7
through Page 50,
Section 15.9
. Ens
u
re that the fan is free to r
u
n and
that the fan
w
heel is clean.
13.6 Ventin
g
and Air Intake Pipe
Inspect all venting and air intake pipe. Ens
u
re that
all seams are sealed and s
u
spension points sec
u
re.
Repair s
u
spension points if any part of the venting
or comb
u
stion air pipe is sagging. Check to make
s
u
re any ins
u
lation is not missing or in poor
condition. Replace as necessary. Check all venting
and air intake components to ens
u
re they are in
good condition, gas tight and corrosion-free.
13.7 Maintenance Checklist
Installation Code and Annual Inspections:
All
installation and service of ROBERTS GORDON
®
eq
u
ipment m
u
st be performed by a contractor
q
u
alified in the installation and service eq
u
ipment
sold and s
u
pplied by Roberts-Gordon LLC and
conform to all req
u
irements set forth in the
ROBERTS GORDON
®
man
u
als and all applicable
governmental a
u
thorities pertaining to the
installation, service, operation and labeling of the
eq
u
ipment.
To help facilitate optim
u
m performance and safety,
Roberts-Gordon LLC recommends that a q
u
alified
contractor cond
u
ct, at a minim
u
m, ann
u
al
inspections of yo
u
r ROBERTS GORDON
®
eq
u
ipment and perform service
w
here necessary,
u
sing only replacement parts sold and s
u
pplied by
Roberts-Gordon LLC.
Annual Fall Start Up
Follo
w
entire start-
u
p proced
u
re at this time and check control settings and
operation.
The Vicinity of the Heater
Do not store or
u
se flammable objects, liq
u
ids or vapors near the heater.
Immediately remove these items if they are present.
See Page 6, Section 3
.
Vehicles and Other
Objects
Maintain the clearances to comb
u
stibles.
Do not hang anything from, or place anything on, the heater.
Make s
u
re nothing is lodged in bet
w
een the heat exchanger t
u
bes.
Immediately remove objects in violation of the clearances to comb
u
stibles.
See Page 7, Section 4
.
Vent Pipe/Terminals
V
enting m
u
st be intact. Using a flashlight, look for obstr
u
ctions, cracks on the
pipe, gaps in the sealed areas or corrosion.
The area m
u
st be free of dirt and d
u
st.
Remove any carbon deposits or scale
u
sing a
w
ire br
u
sh.
If the vent terminal has a screen b
u
ilt in, remove any dirt, d
u
st or deposits
from the screen.
See Page 12, Section 7
through Page 18, Section 8
.
Summary of Contents for Combat UHD-Series
Page 2: ......
Page 4: ......
Page 8: ......
Page 46: ...UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 38 of 57 14 1 General ...
Page 64: ...UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 56 of 57 ...
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......