UHD S
TANDARD
D
UCT
F
URNACE
I
NSTALLATION
O
PERATION
AND
S
ERVICE
M
ANUAL
18 of 57
SECTION
8
: AIR SUPPLY
8
.1 Separated Combustion Installation
When installed as a separated comb
u
stion heater
(UHD[T][X]S[R]), the air for comb
u
stion is dra
w
n in
from o
u
tside the b
u
ilding.
8
.2 Buildin
g
Ventilation
Where ventilation is req
u
ired, air m
u
st be taken from
an o
u
tside point
w
here it is not likely to be
contaminated or obstr
u
cted.
8
.3 Outside Combustion Air Supply
If o
u
tside comb
u
stion air s
u
pply is req
u
ired,
separated comb
u
stion model (UHD[T][X]S[R])
heaters m
u
st be
u
sed.
Caution:
If the b
u
ilding has a slight negative
press
u
re or corrosive contaminants s
u
ch as
halogenated hydrocarbons are present in the air, an
o
u
tside comb
u
stion air s
u
pply to the heater is
req
u
ired. Seal all comb
u
stion air pipe joints.
For models 300-400, the flexible air d
u
ct may be
ins
u
lated to prevent condensation on the o
u
ter
s
u
rface. The o
u
tside air terminal m
u
st not be more
than 1' (31 cm) above the vent terminal.
8
.3.1 Len
g
th Re
q
uirements
Follo
w
the constraints listed
on Page 13, Section 7.5
.
WARNING
Explosion Hazard
Equipment must have access to
uncontaminated air at all times.
Failure to follow these instructions can result
in death, injury or property damage.
Summary of Contents for Combat UHD-Series
Page 2: ......
Page 4: ......
Page 8: ......
Page 46: ...UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 38 of 57 14 1 General ...
Page 64: ...UHD STANDARD DUCT FURNACE INSTALLATION OPERATION AND SERVICE MANUAL 56 of 57 ...
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......